2.4. Inspection
After unpacking, check whether the accessories are complete according to the accessories kit (refer
for
accessories checklist) and check whether any part is damaged.
If any part is found to be missing or damaged during inspection, or if any concealed damage is identified, it should be
reported immediately to the carrier and Vertiv local representative and product supplier.
Table 2-2 Checklist of Accessories in the Kit
Particulars
Specification
Quantity Usages
User manual
A4
1
Site reference use
Gas line copper pipe kit
ø22×1226
1
Field brazing components
Liquid line copper pipe kit
ø12.7×862
1
Field brazing components
Filter drier
Connection size
ø16
1
Field brazing components
Lifting plate
606×50×78
2
External mounting bracket and fixing
bolts for ceiling installation
Cross recessed hexagonal combination bolts
GB9074_13-88_
M6X20
6
External mounting bracket and fixing
bolts for ceiling installation
Type I non-metallic insert hexagon lock nut
M10
8
Provide matching fasteners for threaded
rods on site
Type I hexagon nut with metal insert
GB6170-2000_
M10
4
Provide matching fasteners for threaded
rods on site
Gasket
DMBM8.610.3543
4
Provide matching fasteners for threaded
rods on site
Bushing
ø38.1×ø35
4
Provide matching fasteners for threaded
rods on site
Sleeve
127×ø35
4
Provide matching fasteners for threaded
rods on site
2.5. Installation
In order to realize the design performance of the unit and maximize its service life, proper installation is essential. The
content of this section should be applied in conjunction with the current mechanical and electrical installation regulations
• Installation Notes
1. Vertiv
™
Liebert® XDO unit uses a ceiling-mounted method and must be installed above the heat dissipating equipment.
2. Prior to installing the unit, confirm whether the installation environment meets the requirements (refer
Section 1.6
Environment Conditions
), and confirm whether the building need any modification to match the requirement of piping
layout, for more details consult Vertiv local representative.
3. The installation must strictly follow the design drawings, and reserve maintenance space for daily maintenance and
repairs. Refer to the engineering dimension drawing provided by the manufacturer.