3.  OPERATING INSTRUCTIONS

Trinergy™ Cube features several different operating modes, which are listed in para. 2.1 on page 7.
Trinergy™ Cube automatically selects the most suitable operating mode for the application.
When Trinergy™ Cube is switched on, as described in Procedure 1, the touch screen displays the “System
in bypass” condition (see Fig. 7 on page 13) until the operator starts the inverter.

Figure 7 -  Screen overview of a system in bypass with rectifier ON

3.1.  Single UPS – Switching to automatic operating mode

With  the  Trinergy™  Cube  system  in  bypass  (see  Fig.  7  on  page  13),  press  the  “CONTROL”  button  to
switch to  automatic mode. Enter the “Passcode” in the pop up (see Fig. 8 - on page 14) and then press
“Start” in the control pop up (see Fig. 9 - on page 14) to start the inverter.
The UPS starts in VFI mode (see Fig. 9 on page 14) and remains in this condition for a predetermined
period, during which time the relevant electrical characteristics are monitored. At the end of this period,
which may last for several days depending on the conditions being measured, Trinergy™ Cube selects
the  operating  mode  that  will  supply  the  load  as  efficiently  as  possible  without  negatively  affecting
electrical characteristics such as power factor and current distortion.

Содержание Liebert Trinergy Cube

Страница 1: ...Liebert Trinergy Cube User Manual...

Страница 2: ...Liebert Trinergy Cube UNINTERRUPTIBLE POWER SUPPLY USER MANUAL 10H52243UM60 rev 6...

Страница 3: ...imilar methods even of parts are reserved Transgressors will be liable for damages All rights including rights deriving from patent license or registration of utility model or design are reserved Deli...

Страница 4: ...13 3 1 Single UPS Switching to automatic operating mode 13 3 2 Single UPS Switching to system bypass 15 3 3 Parallel UPS system Switching to automatic operating mode 15 3 4 Parallel UPS system Switchi...

Страница 5: ...Liebert Trinergy Cube Page 4 User Manual 10H52243UM60 rev 6 12 2020...

Страница 6: ...ng the legal regulations of member states on electromagnetic compatibility superseding 2004 108 EC and successive amendments Conformity is established through compliance with the following standards I...

Страница 7: ...4 Display Control panel that includes graphic symbols and data which show the status of the machine push buttons to operate the UPS 1 3 5 I O BOX The I O BOX is an enclosure that is part of the UPS a...

Страница 8: ...el of power conditioning It protects the load from all types of electrical network disturbances that would use a greater amount of energy Efficiency at full load with the latest transformer free techn...

Страница 9: ...ge 8 Figure 3 Dynamic Online High Efficiency Power Conditioning VI Battery operation In this operating mode the connected load is supplied from the batteries via the inverter In the event of a power f...

Страница 10: ...supply system is located This temperature is used as a control parameter to set the maximum available output power limit Dynamically set means that the temperature is being used as the control parame...

Страница 11: ...50 60 Hz or vice versa 2 3 Block diagram See Fig 6 on page 10 Legend QS1 PRIMARY MAINS INPUT SWITCH QS2 BYPASS RESERVE INPUT SWITCH QS3 MAINTENANCE BYPASS SWITCH QS4 OUTPUT SWITCH QS44 OUTPUT BYPASS...

Страница 12: ...stem without interrupting the supply to the load Transfer to and from the maintenance operating mode must be done in accordance with para 4 3 on page 18 and para 4 4 on page 18 This operation may be c...

Страница 13: ...anger operator safety and damage the system This operation must be carried out by authorized personnel and with the external battery disconnected Before closing the battery switch QS9 check that the p...

Страница 14: ...witching to automatic operating mode With the Trinergy Cube system in bypass see Fig 7 on page 13 press the CONTROL button to switch to automatic mode Enter the Passcode in the pop up see Fig 8 on pag...

Страница 15: ...Liebert Trinergy Cube OPERATING INSTRUCTIONS Page 14 User Manual 10H52243UM60 rev 6 12 2020 Figure 8 Passcode Figure 9 Stop or Start Inverter...

Страница 16: ...TROL button on each of the UPS units in the parallel system and follow the same procedure as in para 3 1 on page 13 to switch them to the automatic operating mode All the UPS units will start in the V...

Страница 17: ...s the load is supplied by the bypass and all automatic functions including battery operation are disabled 3 5 Operating mode selection In the default configuration Trinergy Cube can select any of the...

Страница 18: ...n each Core to ON position 4 Wait for rectifier on each Core to ON position On the TS LCD the rectifier icon is green and the VDC is 700V 5 Switch QS44 to ON position 6 Switch QS2 to ON position Fans...

Страница 19: ...FULL 5 Switch QS4_n on each Core to OFF position Fans on each Core OFF 6 Switch QS1 n on each Core to OFF position 7 Switch QS2 to OFF position 8 Switch QS44 to OFF position Fans on the BOX OFF 9 Swit...

Страница 20: ...elded and must be run separately and distanced from the power cables The total length of these cables should not exceed 40m 5 3 Parallel switching procedures Procedures refer to para 2 3 on page 10 5...

Страница 21: ...or all UPS 4 Switch QS4_n on each Core to OFF position all UPS Fans on each Core OFF 5 Switch QS1 n on each Core to OFF position all UPS 6 Switch QS2 to OFF position all UPS Fans on the BOX OFF 7 Swit...

Страница 22: ...S Only in case of BOX in version FULL 3 Switch QS1 n on each Core to ON position all UPS 4 Wait for Rectifier on each Core ON position On the TS LCD the Rectifier icon is green and the VDC is 700V 5 S...

Страница 23: ...Liebert Trinergy Cube PARALLEL OPERATION Page 22 User Manual 10H52243UM60 rev 6 12 2020 BLANK PAGE...

Страница 24: ...eplacement components must exactly match the original component specifications For assistance with specific component specifications replacement component selection and sourcing contact Vertiv technic...

Страница 25: ...ervice bypass Switch the UPS to maintenance bypass operation see Table 4 4 on page 18 6 4 Disconnect the batteries Open the external battery isolator or battery switch if present Before continuing mea...

Страница 26: ...e bin symbol on the right is placed on this product to encourage you to recycle wherever possible Please be environmentally responsible and recycle this product at your local recycling facility at its...

Страница 27: ...of Vertiv Co All other names and logos referred to are trade names trademarks or registered trademarks of their respective owners 2020 Vertiv Co All rights reserved Vertiv com Vertiv Infrastructure L...

Отзывы: