
REV : 2
REV DATE : 06/18
DPN004064
Page :1 /1
PRIMARY CONNECTION LOCATIONS
CONDENSING UNIT W/ HORIZONTAL AIR DISCHARGE
F
or
m
N
o.
: D
P
N
00
10
40
_R
E
V
4
LIEBERT PFD
A
B
C
D
E
F
G
H
PFD037A-L
2 (51)
5-3/4 (146)
8-1/2 (216)
6 (152)
7-1/2 (191)
10-1/2 (267)
3/4"
3/8"
PFD037A-H
PFD054A-L
PFD067A-L
ELECTRICAL CONNECTIONS in. (mm)
7/8"
1/2"
MODEL NUMBERS
7-1/4 (184)
10 (254)
2 (51)
5-1/2 (140)
8 (203)
13-1/4 (337)
PIPING CONNECTION LOCATION in. (mm)
PIPING CONNECTION SIZES O.D. CU
D
C
B
A
Removable Panel - Access to
refrigeration components, electrical
components and connections
1" (25 mm) Dia. Electrical Entrance
for High Voltage Connection
3/4" (17mm) Dia. Electrical Entrance for
Low Voltage Connection
E
Suction Line Connection
Liquid Line Connection
F
Содержание Liebert PFD
Страница 1: ...Liebert PFD Prop Fan Digital Condensing Unit Thermal Management Systems Installer User Guide...
Страница 4: ...Vertiv Liebert PFD Installer User Guide 4...
Страница 20: ...Vertiv Liebert PFD Installer User Guide 20 This page intentionally left blank...
Страница 24: ...Vertiv Liebert PFD Installer User Guide 24 This page intentionally left blank...
Страница 26: ...Vertiv Liebert PFD Installer User Guide 26 This page intentionally left blank...
Страница 34: ...Vertiv Liebert PFD Installer User Guide 34 This page intentionally left blank...
Страница 36: ...Vertiv Liebert PFD Installer User Guide 36 This page intentionally left blank...
Страница 47: ...Vertiv Liebert PFD Installer User Guide...