background image

To contact Vertiv Technical Support: visit www.Vertiv.com

© 2020 Vertiv Group Corp. All rights reserved. Vertiv and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp. All other names and logos referred to are trade names, trademarks or 
registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness herein, Vertiv Group Corp. assumes no responsibility, and disclaims all liability, for 
damages resulting from use of this information or for any errors or omissions. Specifcations are subject to change without notice.

Liebert GXT RT+ 

Quick Installation Guide

  

SL-70692BR_REVA_10-20

 

connect one end of the external 
battery cable to the second 
connector on the battery 
cabinet, then connect the other 
end to the next battery cabinet.

•  Verify that the EBC breaker is in 

the “On” position.

2.  Connecting AC Input

The UPS contains an attached input 
cord with NEMA plug. Perform all wiring 
in accordance to all local and national 
electrical codes.
The UPS is equipped with output 
receptacles. Connect the 
equipment to be protected to the 
output receptacles.

NOTE:

 Allow the batteries to 

charge at-least 5 hours before first 
start-up to ensure adequate 
back-up time. The batteries charge 
when the UPS is connected to AC input 
regardless of the off/on status of the 
UPS.

2.  Choosing a location

Install the UPS in a temperature 
controlled environment that is free 
of corrosive and conductive 
contaminants. Avoid locations near 
heat or water sources and exposed 
to direct sunlight.
For proper ventilation, leave 100 
mm clearance on all sides of the UPS.
The input outlet should be nearby and 
easily accessible.

3.  Installing the UPS

The UPS and optional External 
Battery Cabinets may be installed 
in either a tower or rack 
configuration.

•  For tower installation, assemble 

and attach the tower support 
stands and spacers.

•  For rack installation:
1. Attach the handles to the UPS.
2. Install the rail kit in the rack.

NOTE:

 Align shelf of rack kit with 

rack U number for proper 
alignment.

3. Install the UPS in the rack.
4. Secure the handles to the rack.

After UPS installation, install internal 
batteries shipped in separate box.

Connections

1.  Connecting External Battery 

Cabinet (Optional)

External Battery Cabinets (EBC) 
provide longer battery run-time for 
connected devices. Refer to GXT 
RT+ User Guide to select the 
appropriate model and quantity for 
your GXT RT+ model and 
applications.

•  Verify that the EBC breaker is in 

the “Off” position.

•  Connect one end of the 

supplied EBC cable to the UPS 
and one end to the battery 
cabinet. If connecting more 
than one external battery, 

Powering the UPS

NOTE:

 Do not start the UPS until the 

installation is finished, the system is 
commissioned by an authorized 
engineer, and the external input circuit 
breakers are closed.

1. Make sure the breaker supplying 
power to the UPS is closed, and close 
the input breaker on the rear of the UPS.
2. If necessary, use the LCD display to 
make any required settings. (Refer to the 
User Guide for configuration set up.)
3. Close all output breakers on the rear 
of the UPS (or in an external panel 
board, if used).
4. If external battery cabinets are 
included, close the breakers on the rear 
of each cabinet.
5. Power-on the UPS using the Operation 
and Display Panel by pressing and 
holding the power button.

NOTE:

 During operation, the UPS may 

sound an alarm as the output 
receptacles are powered. You may 
press the power/mute button for 5 
seconds to silence the audible alarm..

Operation and Display Panel

WIRING
Model

Recommended External Breaker

GXTRT-1000LVRT2UXLB

15 A

GXTRT-1500LVRT2UXLB

15 A

GXTRT-2000LVRT2UXLB

20 A

GXTRT-3000LVRT2UXLB

30 A

Отзывы: