28. Press the ESC button to display
C03
.
29. Repeat steps 20 through 27 for the remaining fans’ configuration codes,
C04, C05
and
C06
.
30. Unplug all the contactor output plugs except for the fan to be addressed. Plugs are:
•
P23 = Fan 1
•
P27 = Fan 2
•
P28 = Fan 3
•
P29 = Fan 4
31. Wait 30 seconds.
32. Use the UP or DOWN arrow button to select one of the following parameters.
The correct parameter depends on the supplier of the fan that will be addressed.
•
C00—EBM Papst fan
•
C01—Ziehl-Abegg fan
33. Press the ENT button.
34. Use the UP or DOWN arrow button to the correct fan address number. Fan 1 should be 1 (fan
closest to electric panel end). Fan 2 should be 2, etc.
35. Press the ENT button. The display flashes "
888
" when the command is accepted.
36. Press the ESC button for the parameter to be shown on the display.
37. Repeat steps 30 through 36 for the rest of the fans that need to be addressed.
38. After the last fan is addressed, unplug the power plug, P24, from the control board, and wait 30
seconds.
39. Plug all the contactor output plugs back into the board in their correct positions.
40. Plug P24 back into the control board.
41. After the control board completes its boot cycle and all the contactors are energized, wait
5 seconds.
42. Press the ESC button.
43. Use the UP or DOWN arrow button until
A--
is on the display.
44. Press ENT button.
45. Use the UP or DOWN arrow button to see if any of the following errors are shown.
115: Unable to communicate with Fan 1.
215: Unable to communicate with Fan 2.
315: Unable to communicate with Fan 3.
415: Unable to communicate with Fan 4.
•
If any of these errors appear, check the communication wiring at the problem fan and the
fan before it.
•
If the wiring is correct and properly wired to the terminal, repeat the fan addressing
procedure in steps 30 through 36.
46. If none of the errors listed in step 45 displays, press the ESC button.
Vertiv | Liebert® DSE060™ Installer/User Guide
52
Содержание Liebert DSE060
Страница 1: ...Liebert DSE Packaged Solution Thermal Management System Installer User Guide 60 kW 15 ton Capacity...
Страница 18: ...Vertiv Liebert DSE060 Installer User Guide 18 This page intentionally left blank...
Страница 22: ...Figure 4 3 Typical Center Line of Fork Pockets Vertiv Liebert DSE060 Installer User Guide 22...
Страница 26: ...Vertiv Liebert DSE060 Installer User Guide 26 This page intentionally left blank...
Страница 30: ...Vertiv Liebert DSE060 Installer User Guide 30 This page intentionally left blank...
Страница 66: ...Vertiv Liebert DSE060 Installer User Guide 66 This page intentionally left blank...
Страница 68: ...Vertiv Liebert DSE060 Installer User Guide 68 This page intentionally left blank...
Страница 70: ...Vertiv Liebert DSE060 Installer User Guide 70 This page intentionally left blank...
Страница 97: ...Vertiv Liebert DSE060 Installer User Guide...