2.3.5
Piping
The pipes to be included in the Piping process of the AC are listed below:
Condensed water drainage pipe of the indoor unit;
Water inlet pipe of the electrode humidifier;
Connection of the copper pipe (discharge pipe and liquid pipe) between the indoor unit and
outdoor unit;
Pipe extension kit (optional).
The following points need to be taken into consideration during the Piping process:
All the joints of the refrigerating pipes must be silver-brazed.
The selection, layout, and fixing of the pipes will conform to the industry standards and
norms.
Vacuum pumping and refrigerant charging operations, and procedures must conform to the
industry standards.
Pressure drop, compressor oil return, noise return, and vibration must be considered during
the designing and installation process.
Removing Filters
Before the connection of the pipes in the indoor unit, the filters need to be removed.
Open the rear door of the cabinet to reveal the 2 filters, namely- the top and bottom filters.
Next, proceed to remove the fixing flake of the top filter. Prior to the removal of the fixing flake,
the screws of the flake need to be loosened. Then, the fixing flak will be removed, followed by
removing the top filter.
Use the same method to remove the bottom filter.
Figure 2-17 depicts the process of removing the filters:
Figure 2-17 Removing the Filters
A
A amplified
Fixing flake of the filter
Mounting screw
GB9074_4_88_M4x12
Содержание Liebert CRV Plus
Страница 1: ...Liebert CRV Precision Air Conditioner User Manual ...
Страница 2: ......
Страница 9: ...PART I GENERAL INFORMATION ...
Страница 10: ......
Страница 21: ...Vertiv Liebert CRV User Manual 11 Part II INSTALLATION ...
Страница 59: ...Vertiv Liebert CRV User Manual 49 PART III SYSTEM OPERATION GENERAL MAINTENANCE ...
Страница 95: ...Vertiv Liebert CRV User Manual 85 APPENDIX 4 Hazardous Substances or Elements Declaration ...