WARNING!
Operation above +80 °C (+176 °F) is considered abnormal and should be used on a
temporary
1
basis only.
1
Temporary Operation at Abnormal Temperature: Temporary operation is defined as a period of
not more than eight consecutive hours per day, and a total of not more than 15 days in a year.
(This refers to a total of 120 hours in any given year, but no more than 15 occurrences in that one-
year period.)
Figure 3:
Power Derating Based on Temperature
(at 200 VDC < Vin < 250 VDC and 50 VDC < V
out
< 56 VDC)
Figure 4:
Power Derating Based on Temperature
(at 250 VDC < Vin < 420 VDC and 48 VDC < V
out
< 50 VDC or 56 VDC < V
out
< 58 VDC)
•
Regulation:
a)
Static: Steady state regulation is ±0.6% as controlled within the solar converter for any and all
combinations of load from no load to full load, input voltage, and input frequency at a constant
ambient temperature. The associated system controller may provide increased regulation.
b)
Dynamic: For any step load change within the range of 10% to 90% of full load within 50
microseconds, per Telcordia GR-947-CORE, the maximum voltage transient will not exceed 5% of
the initial steady state voltage within 50±10 microseconds. Recovery to within 1% of the initial
steady state voltage does not exceed 1 milliseconds.
0
20
40
60
80
100
120
-40
-20
0
20
40
60
80
100
%
of
Ou
tp
ut
P
ow
er
Temperature (
℃
)
Output Power vs. Temperature
0
20
40
60
80
100
120
-40
-20
0
20
40
60
80
100
%
of
Ou
tp
ut
P
ow
er
Temperature (
℃
)
Output Power vs. Temperature