Vertiv Tech NetSure 731 A41-S1 Скачать руководство пользователя страница 35

Appendix 1    Technical And Engineering Data            27 

NetSure 731 A41 Subrack Power System    User Manual 

Parameter category 

Parameter 

Description 

alarm point 

DC output alarm and 

protection 

DC output under-voltage 

recovery point 

Default: -45.5 ± 0.2Vdc, 0.5Vdc higher than the under-voltage alarm point 

DC output over-voltage 

protection point 

Default: -59.0 ± 0.2Vdc, configurable through controller 

LLVD 

Default: -44.0 ± 0.2Vdc, configurable through controller

If it is used for outdoor

the default    is-

46.6±0.2Vdc

 

BLVD 

Default: -43.2 ± 0.2Vdc, configurable through controller 

Rectifier 

Current sharing 

The rectifiers can work in parallel and share the current. The unbalanceness is 

better than ± 5%. 

Derate by input (at 

45°C) 

176Vac input, The rectifier output is 100% power 

154Vac~176Vac input

the rectifier output power increased from 2900W to 

3000W. 

85Vac~154Vacinput

the rectifier output power increased from 1500W to 2900W. 

Below 80Vac

the rectifier low pressure power off. 

Walk-in 

The output voltage can rise slowly when the rectifier start up. The walk in time is 

configurable through the controller. 

Fan speed adjustable 

Rectifier fan speed can be set to auto or full speed. 

Over-voltage protection 

The rectifier provides over-voltage hardware and software protection. The 

hardware protection point is 59.5V ± 0.5V, and it requires manual resetting to 

restore operation. The software protection point is between 56V and 59V (0.5V 

above output voltage, 59V by default), and can be set through the controller   

There are two software protection modes, which can be selected through the 

software at the host:   

1. Lock out at the first over-voltage 

Once the output voltage reaches protection point, the rectifier will shut off and 

hold that state. It requires manual resetting to restore the operation   

2. Lock out at the second over-voltage   

When the output voltage reaches the software protection point, the rectifier will 

shutdown, and restart automatically after 5 seconds. If the over-voltage happens 

again within a set time (default: 5min. Configurable through controller), the 

rectifier will shut off and hold that state. It requires manual resetting to restore 

the operation   

Manual resetting: Resetting can be done manually through the controller, or by 

removing the rectifier from system 

Temperature power 

limiting 

The rectifiercan start in -40

Below 45

, the rectifier with full power (3000 W) output. 

From 45

~55

, the rectifier with linearly derating to 2900W. 

From 55

~65

, the rectifier with linearly derating to 2250W. 

From 65

~70

, the rectifier with linearly derating to 0W. 

EMC   

Conducted emission 

Class A          EN55022 

Radiated emission 

Harmonic current 

emission 

Class A          EN61000-3-12 

Voltage fluctuation and 

flash 

EN61000-3-11 

EFT 

Level 4          EN/IEC 61000-4-4 

ESD 

Level 3          EN/IEC 61000-4-2 

Surges 

Level 4          EN/IEC 61000-4-5 

Radiation 

Level 3          EN/IEC 61000-4-3 

Conduction 

Level 2          EN/IEC61000-4-6 

Lightning protection 

features 

At AC side 

The AC input side can withstand five times of simulated lightning voltage of 5Kv 

at 10/700µs, for the positive and negative polarities respectively. It can withstand 

five times of simulated lightning surge current of 20Ka at 8/20µs, for the positive 

and negative polarities respectively. The test interval is not smaller than 1 

minute. It can also withstand one event of simulated lightning surge current of 

40kA at 8/20µs. 

Содержание NetSure 731 A41-S1

Страница 1: ...Vertiv Tech provides customers with technical support Users may contact the nearest Vertiv local sales office or service center Copyright 2017 by Vertiv Tech Co Ltd All rights reserved The contents in...

Страница 2: ......

Страница 3: ...sonnel must be licensed to operate high voltage and AC power In operation the installation personnel are not allowed to wear conductive objects such as watches bracelets bangles rings When water or mo...

Страница 4: ...t be used In live operation keep the arm muscle tense so that when tool connection is loosened the free movement of the human body and tool is reduced to a minimum VI Dangerous energy Warning More tha...

Страница 5: ...y hand protective gloves should be worn to avoid injury by sharp object II Cable connection Notice Please verify the compliance of the cable and cable label with the actual installation prior to cable...

Страница 6: ......

Страница 7: ...5 3 1 Installation Check and Startup 15 3 2 Basic Settings 16 3 3 Alarm Check And System Operation Status Check 17 3 4 Final Steps 18 Chapter 4 Troubleshooting 19 4 1 Controller Alarms And Fault Handl...

Страница 8: ......

Страница 9: ...odule Take NetSure731A41 S1 for example the internal structure is shown as Figure 1 1 Positive terminal BatteryMCB Controller Rectifier AC input terminal N AC input terminal L Earthing screw AC output...

Страница 10: ...nternational standards such as CE NEBS and YD T983 Both the conducted and radiated interference reach Class B The rectifier safety design complies UL CE and NEBS The rectifier is of high power density...

Страница 11: ...inspection shall be done by representatives of both the user and Vertiv Tech Co Ltd To inspect the equipment you should open the packing case take out the packing list and check against the packing li...

Страница 12: ...name Connector specifications Wiring instruction AC power distribution AC input MCB H type terminal max cable CSA 50mm2 AC power line Grounding busbar One M8 bolt OT type wiring terminal max cable CSA...

Страница 13: ...system Figure 2 1 Cabinet and rack installation Installed in cabinet Insert the subrack power system to the matching cabinet as shown in Figure 2 2 Power subrack Figure 2 2 Installed in the cabinet sy...

Страница 14: ...e user requires the system to meet the CE certification install the epoxy board top cover to be installed at a distance of 1 8 meters high above the ground Epoxy board top cover for MFU unit cabling A...

Страница 15: ...erminals are shown in Figure 2 7 AC output terminal N Earthing screw AC output terminal L AC output terminal L AC output terminal N Figure 2 7 Illustration of the connection terminal Note 1 Recommende...

Страница 16: ...he positive battery cable to the DC positive bus bar 2 Connect copper lugs to the other end of the battery cables Bind the connecting parts with insulating tape and put them beside the battery Connect...

Страница 17: ...ttery protection and load disconnection alarm In the controller normal state the alarm contacts are always open when system issues above alarms related contacts will be closed All the status changes s...

Страница 18: ...is installed Dry contact 7 Exist when the second user interface board is installed Dry contact 8 Exist when the second user interface board is installed With default settings when the preceding alarm...

Страница 19: ...t used here 2 J2 is I2 C interface and provides the power See Table 2 6 for the dry contact terminal definition Table 1 1 Dry contact terminal definition Name of double layer port Pin No Pin name Defi...

Страница 20: ...y 8 3 DO7_COM Common contact of relay 7 4 DO8_COM Common contact of relay 8 5 DO7_NO NO contact of relay 7 6 DO8_NO NO contact of relay 8 The definition of dry contact function can be set through cont...

Страница 21: ...les 1 5 6 9 X1 X2 1 8 A X2 X1 X1 2 X1 3 X1 5 X2 3 X2 6 X2 5 Wiring table X1 X2 X1 2 X1 3 X1 5 X2 3 X2 6 X2 5 Colour White blue Green White green X1 9 6 5 1 X2 A 1 8 Figure 2 17 Communication signal ca...

Страница 22: ...14 Chapter 2 Installation Instruction NetSure 731 A41 Subrack Power System User Manual Temp terminal Figure 2 18 The position of temp terminal...

Страница 23: ...bles are connected to the controller module Check that the temperature sensor if any has been installed Startup preparations OK Comments Make sure that all the MCB are switched off and all the fuses a...

Страница 24: ...of the M225Scontroller Settings LVD1 default setting Yes Relay 2 settings Settings Relay 2 default setting LVD1 Setting LVD2 default 43 2V If the subrack system is used for outdoor default setting 45...

Страница 25: ...he alarm should be cleared Repeat the same on battery MCB 2 Switch off a load MCB connected to a load route The alarm Load Fuse N Failure should be triggered Switch on the MCB and the alarm should be...

Страница 26: ...to the equipment have been all removed Rehabilitate the power equipment and close the cabinet door Fill in the installation report and hand it over to the user Record all the operations in the file in...

Страница 27: ...r corresponding alarm For M225S controller Settings Clear For the submenu of Clear you can select Rect Lost to clear corresponding alarm The handling methods of normal alarms are given in Table 4 1 Ta...

Страница 28: ...bove the AC over voltage value the mains grid should be improved 11 Rect Fan Fails Pull out the rectifier to check if the fan is obstructed If yes clean it and push the rectifier back If the fan is no...

Страница 29: ...insert connection terminals to the corresponding J2 J6 and J7 respectively Make sure that the connections are fastened then push the controller into the system 5 Tighten the captive screw of the contr...

Страница 30: ...e the ambient temperature or remove the heat source Rect protection Current sharing imbalance Check whether the rectifier communication is normal If not check whether the communication cable is in nor...

Страница 31: ...rsonnel to disregard any alarms associated with this system while this procedure is performed 2 Loosen the captive screw on the module s handle Pull the handle down out from the module s front panel t...

Страница 32: ...not be easily disabled notify the appropriate personnel to disregard any alarms associated with this system while this procedure is performed 2 Remove the Rectifier from the shelf Refer to a previous...

Страница 33: ...ce the Rectifier into the shelf Refer to the previous procedure for step by step instructions 9 Enable the external alarms or notify appropriate personnel that this procedure is finished 10 Ensure tha...

Страница 34: ...point accuracy 1 Maximum efficiency 94 5 Noise peak peak rated output 200mV 0 20MHz Weighted noise rated output 2mV 300 3400Hz AC input alarm and protection AC input over voltage alarm point Default 2...

Страница 35: ...software at the host 1 Lock out at the first over voltage Once the output voltage reaches protection point the rectifier will shut off and hold that state It requires manual resetting to restore the...

Страница 36: ...to DC circuits 3 000Vac or 4 242Vdc for one minute leak curren 10mA without puncturing and electric arcing AC circuit to earth 50Hz 2 500Vac or 3 535Vdc for one minute leak curren 10mA without punctur...

Страница 37: ...2 Packing list of the battery rack Battery rack Accessory Two layer battery rack Four layer battery rack Accessory 1 2 4 Accessory 2 8 14 Accessory 3 2 4 Accessory 4 2 2 Accessory 5 0 2 Expansion bolt...

Страница 38: ...llation procedure of accessory 2 and accessory 4 2 Installation procedures of four layer battery rack 1 Install accessory 1 accessory 2 and accessory 3 according to Figure 2 a and Figure 2 b 2 Install...

Страница 39: ...y 4 Figure 5 Accessory Table 3 Packing list of the battery rack Accessory Accessory number Accessory 1 2 Accessory 2 6 Accessory 3 3 Accessory 4 2 Expansion bolt 4 pieces Fastener 1 set Installation p...

Страница 40: ...2 Figure 7 Installation procedure of accessory 2 and accessory 4 3 Fixing The Battery Rack 1 Fix the battery rack to the ground according to the installation dimensions shown in Figure 8 The fixing b...

Страница 41: ...fier 1 2 1 2 W80 8 PL QFA 1 SPD1 2 L 1 3 2 4 N L N 1 PE COM NC NO W80 7 J7 7 7 J7 8 W01 W01 31 J1 L 31 J2 L 31 J3 L 31 J4 L 3 2 2 N 2 W01 W01 N 2 31 J1 N 31 J2 N 32 J3 N 32 J4 N 1 4 3 4 31 W2493ZX1 2...

Страница 42: ...84 4 2 W80 9 BUS 1 X5 1 W80 8 QFD Front view 1 2 15 J7 W80 W06 7 31 7 46 18 J2 3 W84 W80 Front top view open the panel 2 J2 1 2 3 J1 1 7 39 7 41 12 1 12 2 8 PL 1 W84 W84 8 PL QFA 1 SPD1 2 QFA2 3 L1 1...

Страница 43: ...N CAN Controller M225S Positive Busbar 1 2 QFB1 1 2 1 2 QFD9 1 2 QFD8 1 2 QFD3 1 2 QFD2 1 2 QFD1 1 2 2 J2 1 2 3 J1 1 2 1 2 1 1 2 DC DC TEMP J6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10...

Страница 44: ...4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 CAN CAN X5 1 J6 J3 J7 J5 J1 J2 J4 v v PE DCSPD 1 2 QFB1 1 2 X6 1 W2453X1 J6 2 1 J3 1 1 2 2...

Отзывы: