INSTALLATION OF VENT SYSTEM, SIDEWALL
With the route of the venting system and selection of materials completed,
as discussed in the section of this manual titled PLANNING THE VENT
SYSTEM, the through the wall vent terminal in place and the first section
of piping, up to first elbow, installed at the blower it is time to complete
the installation of the venting system for the sidewall installation.
FIGURE 20
Before completing the installation of the venting system be sure to read
the sections of this manual discussing the proper method of cutting
and cementing PVC pipe and fittings: VENT PIPE PREPARATION.
It is recommended that the completion of the venting system start at
the blower assembly and run to the coupling on the inside wall of
the vent terminal, Figure18.
The vent system piping should be supported every 5 feet of vertical run
and every 3 feet of horizontal run. All piping and fittings must be joined by
the proper procedures as described under: VENT PIPE PREPARATION.
INSTALLATION OF VERTICAL VENT SYSTEM
A proper flashing or "BOOT" should be used to seal the pipe where
it exits the roof. The total vent system should not exceed the
equivalent feet of pipe as listed in Table 1.
Provide support for all pipe protruding through the roof. All piping
should be properly secured. The vent system piping should be
supported every 5 feet of vertical run and every 3 feet of horizontal
run. All piping and fittings must be joined by the proper procedures
as described under: VENT PIPE PREPARATION.
FIGURE 21
IMPORTANT
The vent system must terminate so that proper clearances are
maintained as cited in local codes or the current edition of the
National Fuel Gas Code, ANSI Z223.1 and as listed below:
1. Vent Termination must extend a minimum of 18 inches above roof
or 18 inches above the anticipated snow level to prevent blockage
of the vent termination, as shown in Figures 20 and 21.
2. The venting system shall terminate at least four (4) feet from or
one (1) foot above any gable, dormer or other roof structure with
building interior access; i.e., vent, window, etc.
3. The venting system shall terminate three (3) feet above any
forced air inlet located within ten feet.