Operating URCap and Running CNC Programs
Running the
VB: Wait for Haas Legacy node
•
This node should be run after the robot has completed all
movement and when the Robot Program is waiting to interact
with the CNC.
•
This node polls the CNC every 2 seconds
(by default)
and as long as
it receives a response and that response shows the CNC as
Busy
it will continue to poll.
•
Then when the CNC is no longer
Busy
, the node checks to see if
the Program Complete Macro Variable is set to
2
, if not a popup
will appear.
•
The Program Complete Macro Variable is set using the 9004
program. This program should be called at the end of every
milling program executed by this URCap.
•
Add M98 P9004 at the end of your program before the M30.
August 2019
VersaBuilt Robotics
27
Содержание 5003870
Страница 1: ...VersaBuilt Robotics with Universal Robots Haas Legacy CNC Communication Kit Product No 5003870 ...
Страница 5: ...Connect Ethernet Cable and Cycle Start Relay August 2019 VersaBuilt Robotics 5 ...
Страница 8: ...Cycle Start Relay Connecting to Haas CNC Controller August 2019 VersaBuilt Robotics 8 ...
Страница 13: ...Electrical Diagram Connecting to UR Control Box August 2019 VersaBuilt Robotics 13 ...
Страница 14: ...Install Software on UR Teach Pendant and Haas Controller ...
Страница 24: ...Operate Using the Teach Pendant Commands to run CNC programs ...