D20x22 Series II Navigator HDD
Preparation 40-5
If startup is requested by the crew at the location of the exposed rod or tool:
Step 1:
After checking that everyone at the location of the exposed rod or tool is away from the cutting tool and
everyone has been informed that startup will occur, a startup command may be sent to the operator.
Step 2:
When the startup command is received, the operator must return a message confirming that the
message was received and understood.
Step 3:
The crew at the location of the exposed rod or tool must respond by providing confirmation of the
machine operator's intention to startup.
Step 4:
When confirmation is received, the operator may resume operation.
Содержание D20x22 Series II
Страница 14: ...This page intentionally left blank ...
Страница 28: ...This page intentionally left blank ...
Страница 84: ...This page intentionally left blank ...
Страница 218: ...This page intentionally left blank ...
Страница 224: ...This page intentionally left blank ...