Z205338-0F
Page 7 of 10
©2013 Veris Industrie
09132
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris ‘V’ logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
Other companies’ trademarks are hereby acknowledged to belong to their respective owners.
Installation Guide
Power Monitoring
H81xx
TM
10. H8163 and H8167:
Set the Pulse Rate selection switch to the desired output rate (kWh per pulse). Note that 0.1 is not valid for
1600 A systems, and 0.1 and 0.25 are not valid for 2400 A systems.
N
A
+ A D + B D
+ C D
B
C
N
A B
C
+ - + - + -
Display
Plain
Full
Black
Black
Yellow
Yellow
Red
Red
1.0
0.5
0.25
0.1
11. Secure the meter cover shut using a padlock, wire tie, or other locking device.
12. Apply power to the meter.
13. Check the display. At initial power-up, the meter checks each phase. If the phasing is correct, an OKAY message appears. If
the phasing is incorrect, an error message indicates which color leads are not connected properly. Disconnect power before
reconnecting leads.
14. Check the power reading. Expected power is estimated as follows:
kW = Volts(L-L) * Amps * 1.732 * PF 1000
kW = horsepower * 0.746
15. To reset the kWh accumulator to zero, press and hold the two pushbuttons on the inside of the meter cover for 10 seconds.
16. To reset the kW max. register, press and hold the two pushbuttons on the inside of the meter cover for 5 seconds.
Installation (cont.)
www.
.com
1.800.561.8187