Ensure that the element is correctly placed: the thin part of the element legs should be
entirely within the heating chamber; the element should not touch the bottom of the
chamber. A guide to the correct placement is given in the table below, using the
measurement from the top of the clamp to the top of the element.
Replacement: heat up the furnace to a moderate temperature and ensure that the
furnace is controlling properly, in case the previous element failure resulted from a fault
in the control system.
After installing new elements operate the furnace at 1500 °C for an hour. This creates a
protective glaze on the element surface.
Element Fitting Layout
Use of Clip Tool
The distance from the top of the element clamp to the top of the element should be
40 mm.
Larger clips require the clip tool, comprising two levers:
1. Clip tool
2. Apply hand pressure
63
8.0 Repairs and Replacements
Содержание CARBOLITE GERO HTF 18/27
Страница 10: ...2 0 Installation 2 4 Transit Clamp Removal 10 ...
Страница 12: ...2 0 Installation The four transit clamps are circled on the photograph below Photograph 3 12 ...
Страница 13: ...2 5 Thermocouple Installation 13 2 0 Installation ...
Страница 15: ...Photograph 3 Photograph 4 Photograph 5 Photograph 6 15 2 0 Installation ...
Страница 45: ...Power Limit View 45 4 0 3508 Dual Loop Cascade ...
Страница 64: ...8 0 Repairs and Replacements Element Connections 3 phase 9 elements 64 ...
Страница 70: ......
Страница 71: ...Notes Service Record Engineer Name Date Record of Work ...