2.4
Split Model CF24
When transported as two components, connect them as follows. Remove the side
panels from the top and the left-hand side from the base. Remove the four fixing bolts
from the top of the base. Place the top onto the base, with the door above the control
panel and bolt the two halves together.
Connect the thermocouple comp. cables to the
appropriate terminal blocks. There are two such
cables, or three if chamber over-temperature
control is fitted. The blocks and cables are
labelled (e.g. 1, 2 , 3).
Connect the door switch wire pair to the terminal
block near the door mechanism.
Connect the power cables to the terminal blocks below the lower element holes.
Because of different power supplies and national standards, the details may differ from
the details shown, or the terminals may be in reverse order.
Under no circumstances should any objects be placed on top of the product.
Always ensure that any vents on the top of the product are clear of any
obstruction. Always ensure all cooling vents and cooling fans (if fitted) are
clear of any obstruction.
2.5
Heating Elements
The silicon carbide elements are VERY FRAGILE and are packed separately. Fit them
accordingly to the instructions in section 8.0 for element fitting and replacement
instructions.
2.6
Baffle
This product is supplied with a baffle, a refractory tile. It should be carefully placed at
the back of the furnace chamber, as shown in the image below.
2.7
Electrical Connections
Connection by a qualified electrician is recommended.
8
Содержание CARBOLITE GERO CF 24B
Страница 4: ...12 0 Specifications 37 12 1 Environment 37 4 ...
Страница 38: ......
Страница 39: ...Notes Service Record Engineer Name Date Record of Work ...