1
MF56 – 1.05
Installation, Operation &
Maintenance Instructions
1530°C Chamber Furnaces
CDF 15/1b
This manual is for the guidance of operators of the above Carbolite Gero products
and should be read before the furnace is connected to the electricity supply.
C
ONTENTS
Section
page
1.0
Symbols & Warnings
2
2.0
Installation
2
3.0
Operation
4
4.0
Maintenance
6
5.0
Repairs & Replacements
8
6.0
Fault Analysis
12
7.0
Circuit Diagrams
13
8.0
Fuses & Power Settings
14
9.0
Specifications
15