 3.2. EAHU Start Control Signals

VTS-E-0006 module is equipped with three special terminals monitoring start-up of the EAHU.

Source of control

Control channel;

Connection place

Function

Remote control

ESP

 – channel 4

X3:25

 

 

X3:26

External start permission – lack of the permission, blocks the control signals 

coming from channel no 1 (

LOC

) and no 2 (

RC

). 

Starting-up and output control of the EAHU is only accessible through the 

CO

 

channel (the CO detection module input).

!

   

In case when connecting an external ESP control signal is not 
intended, move both slider connectors S1, located on the VTS-E-0006 
PWB, to the ON position.

ALARM

 – channel 5

X3:11

 

 

X3:12

Fire sensor signal - the highest priority – interruption of sensor circuit blocks all 

remaining control channels and stops the EAHU.

!

   

The input is equipped with memory module. Operation of the exhaust 
unit after a fire alarm requires fixing the cause of the alarm by turning 
off and switching on again the Q1 mains switch of the control gear.

FC ALARM

 – channel 6

X3:27

 

 

X3:28

Failure signal of frequency converter. Priority of this channel is the same as the 

input of fire sensor - interruption of FC ALARM circuit blocks all control channels 

and stops the exhaust unit.

!

   

1. 

 

List of events which triggers the alarm to stop the exhaust unit 
depends on properties and configuration of the converter.

 

 

2. 

 

The input is equipped with memory module. The exhaust unit start-
up after converter alarm event requires fixing the cause of the alarm 
and turning off and switching on again the Q1 mains switch of the 
control gear.

 3.3. Order of Control Channels

AND

OR

LOC

RC

ESP

CO

ALARM

FC ALARM

2U1

OR

AND

AND

x

y

AND

z

OR

x

y

z

x

y

z

0

0

0

0

1

1

1

0

1

1

1

1

x

y

z

0

0

0

0

1

0

1

0

0

1

1

1

 3.4. Damper Control 

M2

 damper opening request is set at the same time as the

 2U1 to 2U4

 converters start signal. Operating contact controlling the damper 

provides the 

X3:20

 terminal with 

24V AC

 in relatiobn to the 

X3:21

 terminal.

3.5. EAHU Start Confirmation for Remote Equipment

Activation of a single voltage-free switching contact marked 

START CONFIRMATION

 is done in parallel with setting the 

2U1 to 2U4

 

converters start signal. The contact is provided to the 

X3:22 ÷ X3:24

 terminals.

!

   

1.  The EAHU operation confirmation signal indicates that the control system is working properly but it does not control and 

guarantee the performance of the air exhaust system. The VS...CG-0-1 control gears do not control the air flow in the 
exhaust system and do not detect e.g.: blockage of the air damper.

 

 2. Rated parameters of the START CONFIRMATION contact: 24V AC/DC, current 2A

3.6. Filter Check

Terminals 

X3:29

 

 

X3:32

 are designed for connecting pressure control units: 

2S1H

 and 

2S2H

. A contact shorting of any pressure control 

unit activates the filter contamination warning LED located at the control gear front panel. 

!

   

Contamination of filter does not influence controlling of the EAHU. The pressure control inputs are used exclusively for 
indicating filter contamination status and prompting their replacement.

Содержание VS 180-300 CG 0-1

Страница 1: ...EN Control gear for Exhaust Air Handling Units EAHU VS 21 150 CG 0 1 VS 180 300 CG 0 1 VS 400 650 CG 0 1 Operation and Maintenance Manual DTR CG ver 1 7 09 2021...

Страница 2: ...www vtsgroup com The control gear complies with European Standard IEC EN 60439 1 AC Standard Switchboards and low voltage control gears EN...

Страница 3: ...trol 4 3 2 EAHU Start Control Signals 5 3 3 Order of Control Channels 5 3 4 Damper Control 5 3 5 EAHU Start Confirmation for Remote Equipment 5 3 6 Filter Check 5 4 TECHNICAL SPECIFICATION 6 4 1 Const...

Страница 4: ...n Power of the Control Gear Element Function 24V DC Control circuits supply LED 24V READY Ext start permission LED REMOTE Remote control LED 1 4 Detailed description of signal lamps CO Control LED ind...

Страница 5: ...witch of the control gear Function Condition Operation EAHU Start up Local fan speed adjuster I II III setting I II or III Each of the three control signals local remote from the CO detector may indep...

Страница 6: ...control LOC channel 1 connection J12 Exhaust fan speed can be controlled from the front of the control gear Remote control RC channel 2 X3 13 X3 16 Exhaust fan speed can be controlled through remote c...

Страница 7: ...h memory module The exhaust unit start up after converter alarm event requires fixing the cause of the alarm and turning off and switching on again the Q1 mains switch of the control gear 3 3 Order of...

Страница 8: ...voltage of control circuits 24 V AC EMC environment 1 4 3 Parameters of protection elements of the VTS E 0006 electric module F11 Protection module of power supply circuit of the CO detection module P...

Страница 9: ...ct indicating exceeding of the first threshold of CO concentration N1F CO I 1 1 9 CO detector contact indicating exceeding of the second threshold of CO concentration N1F CO II 1 1 10 CO detector cont...

Страница 10: ...er 2 Motor feeder 1 Control gear feeder 2 Control gear rated current kW A 1x230V 50Hz 3x230V 50Hz MicroDrv VLT mm2 mm 2 mm 2 A 0 75 3 gG16 1 3x1 5 4x1 5 3x2 5 4 5 1 1 4 5 gG16 1 3x1 5 4x1 5 3x2 5 6 1...

Страница 11: ...prior notice 9 0 1 8 7 69 1 5 4 3 2 I I I I I I I I I I I I O C E T O M E R Y D A E R C D V 4 2 1 M 2 1 N L PE GND 0 10V IN1 COM IN2 24V AC DC 1 2 1209 0062 GND 0 10V 10V AN1 GND OR 1x230V 3x400V 1 2...

Страница 12: ...otice 10 0 1 8 7 69 1 5 4 3 2 I I I I I I I I I I I I O C E T O M E R Y D A E R C D V 4 2 1 M 2 1 N L PE GND 0 10V IN1 COM IN2 24V AC DC 1 2 1209 0062 GND 0 10V 10V AN1 GND 3x400V 2 M 2 1 N L PE AN1 G...

Страница 13: ...E R C D V 4 2 1 M 2 1 N L PE GND 0 10V IN1 COM IN2 24V AC DC 1 2 1209 0062 GND 0 10V 10V B GND OR 1x230V 3x400V 1 2 1203 1002 A B GND A For VVS005s MOTOR EC072 25E3G01 B190 Cable1 power Brown L Cable2...

Страница 14: ...A E R C D V 4 2 1 M 2 1 N L PE GND 0 10V IN1 COM IN2 24V AC DC 1 2 1209 0062 GND 0 10V 10V 3x400V 2 M 2 1 N L PE 1 2 1203 1002 For MOTOR EC072 25E3G01 B190 Cable1 power Brown L Cable2 communication Y...

Страница 15: ...ns EN VTS reserves the right to implement changes without prior notice 13 0 1 8 7 6 9 1 5 4 3 2 1 M 2 3 1 U 2 I I I I I I I I I I I I O C E T O M E R Y D A E R C D V 4 2 Electric scheme of VS 21 150 C...

Страница 16: ...4 5 Q1 1L1 1L1 1L2 1L2 1L3 1L3 PE N L1 L2 L3 1L1 1L2 1L3 2M1 3 2U1 1 2 3 4 5 6 2F1M N N PE PE H1 T1 24V 230V F1 1 N 1L3 2 N1 1L3 12 11 10 13 15 14 16 17 18 VTS E 0006 J12 3 2 1 4 6 5 7 8 9 21 20 19 2...

Страница 17: ...650 CG 0 1 control gear 6 7 8 10 9 1 2 3 4 5 Q1 1L1 1 1 L L 1 1 1L2 1 1 L L 2 2 1L3 1 1 L L 3 3 PE N L1 L2 L3 1L1 1L2 1L3 2M1 2M3 3 3 2U1 1 1 2 2 3 3 4 4 5 5 6 6 2F1M N N N PE PE PE N 1 1 L L 1 1 1 1...

Страница 18: ...Advanced instructions EN VTS reserves the right to implement changes without prior notice 16 AE 0 2S2H 2M1 2U1 2S1H 2Y1 CO...

Отзывы: