Page 7 z 10
Venture Industries Sp. z o.o.
Mokra 27 Street
05-092 Łomianki-Kiełpin
Poland
OPERATION AND MONTAGE MANUAL
No RFEC/U/2017- 2 (EN)
tel. (0-22) 7519550; 7512031, fax (0-22) 7512259; 7511202, e-mail: [email protected]
APPENDIX A - (THE DEVICE RECEIPT FORM)
Before launch
Check
confirmation
Type and model of fan are in accordance with the order.
The fan is undamaged.
There is no foreign body inside fan and the fan is clean.
The fan is reliably and solidly fixed in workplace.
The fan is properly levelled
Wires are properly tightened.
Ambient temperature and transported medium temperature are compatible with fan nameplate
Proper electrical protection is applied
Grounding of fan is applied.
Mains supply is compatible with fan power supply.
Power supply disconnecting switch (with 3mm visible gap) is applied.
Personnel using the fan read and understood the operation and montage manual.
Proper inlet and outlet covers (grids) have been applied
After fan launch (continuous work period minimum 30 minutes)
Readings and set of vibration measurement device has been written (they are available in future)
Readings and set of current measurement device has been written (they are available in future)
Value of current for each of phase does not exceed nominal one
The vibration value is not higher than permitted.