![Vents VUE 250 VB EC Series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/vents/vue-250-vb-ec-series/vue-250-vb-ec-series_user-manual_1002415010.webp)
10
VUT/VUE 250 VB(E) EC L/R
www.ventilation-system.com
Unit wall mounting
Dowels for wall mounting are not included in the delivery set and should be ordered separately.
While choosing dowels consider the material of the mounting surface as well as the weigh of the unit, refer to the “Technical data” section.
Dowels for unit mounting should be selected by a qualified specialist.
Insert the dowel into the wall.
The delivery set includes brackets for fixing the unit in earthquake-prone areas.
Install the mounting brackets on the wall.
Unscrew the feet.
Hang the unit and screw the feet through the holes in the brackets.
CONDENSATE DRAINAGE
Condensate drainage is required for the VUT 250 VB(E) EC L/R unit series.
The hole for the drain pipe is at the bottom of the unit. Remove the plug from the hole in the unit. Install the drain pipe from the delivery
set into the hole, then connect the drain pipe to the sewage system using the U-trap kit (available upon separate order). The U-trap must
be constantly filled with water. The pipe slope downwards must be at least 3°.
1
2
3
4
min 3°
1 – drain pipe 2 – U-trap 3 – connecting pipe 4 – sewage system
Содержание VUE 250 VB EC Series
Страница 18: ...18 VUT VUE 250 VB E EC L R www ventilation system com ...
Страница 20: ...V240EN 01 ...