Vents VPQ 710 Скачать руководство пользователя страница 2

2

VDO

www.ventilation-system.com

CONTENTS

This user’s manual is a main operating document intended for technical, maintenance, and operating staff.
The manual contains information about purpose, technical details, operating principle, design, and installation of the VDO unit  and all 
its modifications.
Technical and maintenance staff must have theoretical and practical training in the field of ventilation systems and should be able to 
work in accordance with workplace safety rules as well as construction norms and standards applicable in the territory of the country.
The information in this user’s manual is correct at the time of the document’s preparation.
The Company reserves the right to modify the technical characteristics, design, or configuration of its products at any time in order to 
incorporate the latest technological developments.
No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means in any information 
search system or translated into any language in any form without the prior written permission of the Company.

Safety requirements ..................................................................................................................................................................... 3
Purpose ................................................................................................................................................................................................ 5
Delivery set ........................................................................................................................................................................................ 5
Designation key .............................................................................................................................................................................. 6
Technical data .................................................................................................................................................................................. 7
Unit design and operating principle ................................................................................................................................. 8
Installation and set-up................................................................................................................................................................ 9
Connection to power mains .................................................................................................................................................. 11
Commissioning ............................................................................................................................................................................... 13
Technical maintenance .............................................................................................................................................................. 14
Storage and transportation regulations .......................................................................................................................... 16
Storage and transportation regulations .......................................................................................................................... 16
Manufacturer’s warranty ........................................................................................................................................................... 17
Certificate of acceptance .......................................................................................................................................................... 19
Seller information .......................................................................................................................................................................... 19
Installation certificate .................................................................................................................................................................. 19
Warranty card ................................................................................................................................................................................... 19

Содержание VPQ 710

Страница 1: ...VDO Axial smoke extraction fan USER S MANUAL...

Страница 2: ...The Company reserves the right to modify the technical characteristics design or configuration of its products at any time in order to incorporate the latest technological developments No part of this...

Страница 3: ...life of the unit While transferring the unit control the user s manual must be turned over to the receiving operator UNIT INSTALLATION AND OPERATION SAFETY PRECAUTIONS Disconnect the unit from power...

Страница 4: ...nit from power mains prior to any technical maintenance Do not store any explosive or highly flammable substances in close proximity to the unit When the unit generates unusual sounds odour or emits s...

Страница 5: ...ficiency effectiveness and safety Used for continuous operation in a general ventilation system THE UNIT SHOULD NOT BE OPERATED BY CHILDREN OR PERSONS WITH REDUCED PHYSICAL MENTAL OR SENSORY CAPACITIE...

Страница 6: ...limate 60 40 C T tropical climate 10 50 C M maritime moderately cold climate 40 40 C O general climatic modification except maritime climate 60 50 C OM general maritime climatic modification 40 40 C V...

Страница 7: ...ribed in this manual L B D D1 D2 d n holes MODEL Dimensions mm L D D1 D2 d n B VDO 400 400 400 450 490 8 12 525 VDO 450 400 500 450 500 540 8 12 580 VDO 500 400 500 550 500 560 600 12 12 620 VDO 560 4...

Страница 8: ...casing for easy maintenance All the casing components are powder coated for improved protection against the environmental effects The fan impeller has a split design and is connected to the motors The...

Страница 9: ...be 3 4 D where D is the inner diameter of the fan The length of the straight duct section downstream of the fan should be 1 5 2 D Reduction of the recommended duct length values results in a drop of t...

Страница 10: ...tional to the square of velocity decrement The fan should not be equipped with a downstream contractor Installation near bends To install the fan directly downstream of a bend elbow use a curved secti...

Страница 11: ...automatic control system The fan motor is rated for connection to three phase AC 400 V 50 60 Hz Connect the fan motor via the terminal block according to the electrical mains wiring diagram using a d...

Страница 12: ...s equipped with a damping device to smooth out the inrush the high startup torque has no adverse effects on the operation of the driven mechanism Soft start SS starting A soft starter gradually increa...

Страница 13: ...tive equipment the higher the chances of success The use of an FC in this case helps solve the problem fundamentally Standard switching equipment automatic circuit breakers contactors and motor starte...

Страница 14: ...n will not start No power supply Check the mains switch Check the electrical connections against the wiring diagram Jammed motor Carefully check the fan impeller for possible seizure and eliminate it...

Страница 15: ...network Wrong choice of the fan Replace the fan with a unit of proper standard size The fan supplies less air than expected Wrong calculation of the ventilation network and wrong selection of the fan...

Страница 16: ...ssible damage to the unit Follow the handling requirements applicable for the particular type of cargo The unit can be carried in the original packaging by any mode of transport provided proper protec...

Страница 17: ...technical maintenance of the unit External damage to the unit casing excluding external modifications as required for installation and internal components caused by the user Redesign or engineering c...

Страница 18: ...18 VDO www ventilation system com...

Страница 19: ...IFICATE The VDO _______________________ unit is installed pursuant to the requirements stated in the present user s manual Installation Stamp Company name Address Phone Number Installation Technician...

Страница 20: ...V118 1EN 01...

Отзывы: