Op er ating In struc tions
1. Read and understand the Operator’s Manual before operating the VR300.
2. After start-up, select desired engine speed with the throttle. Always maintain adequate
RPM to keep engine from lugging or stalling during operation.
3. Release parking brake.
4. Increase or decrease the speed of the tractor by movement of the speed control lever.
5. Make allowances in speed selection for hills, slopes, and rough terrain. If the operator is
uncomfortable or unsure of the unit’s stability, the operator should cease operation in that
condition.
6. The hydrostatic transmission provides a braking action when the speed control lever is
returned to neutral.
7. After operation, set parking brake, turn off engine, and remove ignition key.
OPERATION
C-4
Содержание VR300
Страница 7: ...Safety Decal Locations SAFETY B 3 ...
Страница 19: ...Electrical Schematic MAINTENANCE D 6 ...
Страница 20: ...PARTS E 1 ILLUSTRATED DRAWING CHAIR COMPARTMENT ...
Страница 22: ...PARTS E 3 ILLUSTRATED DRAWING TAILGATE MECHANISM ...
Страница 24: ...PARTS E 5 ILLUSTRATED DRAWING BRAKE MECHANISM ...
Страница 26: ...PARTS E 7 ILLUSTRATED DRAWING PUMP CONTROLS ...
Страница 28: ...PARTS E 9 ILLUSTRATED DRAWING DRIVE WHEEL ...
Страница 30: ...PARTS E 11 ILLUSTRATED DRAWING ENGINE ...
Страница 32: ...PARTS E 13 ILLUSTRATED DRAWING HANDLE BAR CONTROLS ...
Страница 34: ...PARTS E 15 ILLUSTRATED DRAWING COAST LEVER ELECTRICAL PARTS ...
Страница 36: ...PARTS E 17 ILLUSTRATED DRAWING SHIELDS BATTERY ...
Страница 38: ...PARTS F 1 ILLUSTRATED DRAWING GUN RACK ...
Страница 40: ...PARTS F 3 ILLUSTRATED DRAWING BRAKE LEVER EXTENSION ...
Страница 42: ...PARTS F 5 ILLUSTRATED DRAWING RAMP TAILGATE LEVER EXTENSION ...
Страница 44: ...PARTS F 7 ILLUSTRATED DRAWING TACHOMETER HOUR METER ...