5.
Then, put the roof flashing (E) in place and seal the joint between the roof and the flashing with roofing
pitch. For sloping roofs, place the flashing under the upper shingles and on top of the lower shingles.
Nail the flashing to the roof, using roofing nails.
6.
Place the storm collar (F) over the flashing, and tighten it with the bolt supplied. Finally, seal the joint
between the storm collar and the chimney, using silicone caulking.
7.
Install the chimney cap (G).
8.
When a ventilated roof flashing is installed, precautions are to be taken not to caulk or seal the
ventilating openings.
**
THE STRUCTURAL INTEGRITY OF THE FLOOR, WALL, AND CEILING/ROOF MUST BE MAINTAINED
NOTE: THE FLOOR AND WALLS BELOW THE ATTIC MUST BE INSULATED USING THE SAME INSULATION.
Содержание ME300
Страница 12: ...12 ME300 Installation and Operation Manual ...
Страница 17: ...ME300 Installation and Operation Manual 17 CLEARANCES A 16 406 mm B 46 1168 mm C 8 203 mm ...
Страница 33: ...ME300 Installation and Operation Manual 33 Direct installation Exterior offset installation ...
Страница 60: ...60 ME300 Installation and Operation Manual APPENDIX 2 EXPLODED DIAGRAM AND PARTS LIST ...