background image

Page 4

JCH/B1 0915A

Electrical

1 ¾”

Centerline

of Hood

8” Outlet

Vent

Holes

5 ¼”

5 ½”

Wall Side

Centerline

Of Hood

Wall Side

Electrical (2)

10" Outlet

Centered On

Hood Top

12 7⁄8”

9 1⁄8”

1 ¾”

Duct Cover

(Top of Hood)

10" Dia. or 12" Dia.

Transition Location

"Centered"







Wall Side

7"

Electrical (2)

Centerline

Of Hood

12" Outlet

Centered On

Top Of Hood

1 ¾”

16 ½”

5 ½”

1 ¾”

Duct Cover

(Top of Hood)

10" Dia. or 12" Dia.

Transition Location

"Centered"



6” Outlet

Vent

Hole

3 ¼”

Electrical

Centerline

of Hood

Wall Side

1 ¾”

1 3⁄8”

5 ¼”

Installation Details Continued

Connection Diagram (36” - 48” Widths)

300 CFM B100 Single Blower

(Top View)

600 CFM B200 Dual Blower

(Top View)

(Front View)

(Front View)

Connection Diagram (48”- 60” Widths)

The transition shown (VP562) 

is installed in the hood at the 

factory as a standard item. 

It will be located in the exact 

center of the duct cover (left to 

right & front to rear).

900 CFM B200 Dual & B100 Single Blower

(Top View)

VP562 Standard Transition 

Installed (Front View)

Connection Diagram (36” - 48” Widths)

Connection Diagram (54”- 66” Widths)

The transition shown (VP563) 

is installed in the hood at the 

factory as a standard item.  It 

will be located in the exact 

center of the duct cover (left to 

right & front to rear).

1200 CFM Double B200 Dual Blowers

(Top View)

VP563 Standard Transition 

Installed (Front View)

Содержание JCH/B1 Series

Страница 1: ...tion Included VP563 Standard Transition Included 36 30 6 Outlet Vent Hole 3 Electrical Centerline of Hood Wall Side 1 1 3 8 5 Electrical Mechanical Specifications For Blower Units Model Volts Amps Hz RPM CFM SP 0 0 Equivalent CFM CFM SP 0 1 CFM SP 0 2 CFM SP 0 3 Minimum Round Duct Size Sones B100 Single 115 2 5 60 1550 300 450 273 245 225 6 28 in 2 5 4 B200 Dual 115 4 0 60 1550 600 900 531 480 430...

Страница 2: ...illing into wall or ceiling do not damage electrical wiring and other hidden utilities C Ducted fans must always be vented to the outdoors D Sufficient air is needed for proper combustion and exhausting of gases through the flue chimney of fuel burning equipment to prevent back drafting Follow the heating equipment manufacturer s guideline and safety standards such as those published by the Nation...

Страница 3: ...100 B200 10 round or equivalent 79 sq in VP562 Included Two Duals Two B200s 12 round or equivalent 113 sq in VP563 Included Ducting Requirements NEVER reduce the duct size When combining ducts together the square inch area must reflect the total square inch area of the ducts being combined Do not use flexible or corrugated duct This type of duct will restrict airflow and reduce performance Only us...

Страница 4: ...next page for further details on exhaust outlet placement Use duct tape to seal all joints A complete listing of available Vent A Hood ducting materials is provided on the back page of this instruction sheet Transition heights are as follows Single Blower B100 6 round duct will connect directly to the top of the hood Dual Blower B200 8 round duct will connect directly to the top of the hood Single...

Страница 5: ... 48 Widths 300 CFM B100 Single Blower Top View 600 CFM B200 Dual Blower Top View Front View Front View Connection Diagram 48 60 Widths The transition shown VP562 is installed in the hood at the factory as a standard item It will be located in the exact center of the duct cover left to right front to rear 900 CFM B200 Dual B100 Single Blower Top View VP562 Standard Transition Installed Front View C...

Страница 6: ...ing from the service panel to the hood location for each motor box Consult the connection diagrams on previous page for further details on electrical placement Extend wire s to the hood Electrical connection s will occur before the hood is installed on the wall Warning Make sure power is off and locked at the service disconnecting means on the service panel during installation 5 Remove the shippin...

Страница 7: ...cover up to the wall and hang the hood on the mounting strip taking care to properly align the duct connection between the elbow on the hood and the duct in wall Secure the hood to the mounting strip by installing the screws previously removed in Step 10 into the pilot holes drilled in Step 12 SKIP STEPS 14 AND 15 PROCEED DIRECTLY TO STEP 16 14 Insert the electrical wire from the service panel int...

Страница 8: ...2 23 VP563 30 3 x 10 TO 7 TRANSITION MODEL DIM VP521 3 x 10 to 7 7 7 3 10 LOW PROFILE ROOF JACK MAXIMUM 4 12 PITCH MODEL DIM 6 VP539 VP540 VP541 6 Round 7 Round 8 Round 16 16 LOW PROFILE ROOF JACK MAXIMUM 4 12 PITCH MODEL DIM 10 VP552 VP553 10 Round 12 Round 22 20 ADJUSTABLE ELBOW MODEL DIM VP513 VP514 VP515 6 Round 7 Round 8 Round 6 7 8 VP513 8 VP514 9 9 16 VP515 10 5 8 BACK SIDE VENT ELBOW MODEL...

Страница 9: ...unt EPT NEPT SEPT C n a n a n a VP513 VP515 or VP561 n a 30 Tall Wall Mount C n a VP513 VP515 or VP561 VP513 VP515 or VP561 2 VP515 or 2 VP561 CWH B n a VP513 VP515 or VP561 VP513 VP515 or VP561 2 VP515 or 2 VP561 TILT Out TLH C n a VP513 VP561 n a n a JCH A1 Designer Series D n a VP513 VP515 or VP561 VP513 VP515 or VP561 2 VP515 or 2 VP561 JCH B1 Designer Series D n a VP513 VP515 or VP561 VP513 V...

Страница 10: ...ew VP513 6 Round VP515 8 Round VP561 8 Round to 6 x 8 1 2 Rectangular 8 Round Diagram D Off the Top Within the Duct Cover Drawing Not To Scale Side View VP513 6 Round VP515 8 Round VP561 8 Round to 6 x 8 1 2 Rectangular 8 Round VP559 3 1 4 x 10 Rectangular VP561 8 Round to 6 x 8 1 2 Rectangular 7 Tall VP559 3 1 4 x 10 4 1 4 Tall VP513 6 Round 8 1 2 Tall When Fully Adjusted to 90 Degrees VP515 8 Ro...

Страница 11: ...he KHSLD Liner Insert all Vent A Hood range hoods duct out the top and can be back vented only by use of transitions and or elbows Transition Heights VP559 3 1 4 x 10 Rectangular 4 1 4 Tall VP513 6 Round 8 1 2 Tall When Adjusted To 90 Degrees VP515 8 Round 10 3 4 Tall When Adjusted To 90 Degrees VP561 8 Round To 6 x 8 1 2 Rectangular 7 Tall K Series With VP559 Installed Back View B100 Blower Outle...

Страница 12: ...nge Hood and the KHSLD Liner Insert all Vent A Hood range hoods duct out the top and can be back vented only by use of transitions and or elbows Transition Heights VP513 6 Round 8 1 2 Tall When Adjusted To 90 Degrees VP515 8 Round 10 3 4 Tall When Adjusted To 90 Degrees VP561 8 Round To 6 x 8 1 2 Rectangular 7 Tall B300 Blower Outlets With VP513 And VP561 Installed Back View B300 Blower Outlets Wi...

Страница 13: ... Cabinet Range Hood and the KHSLD Liner Insert all Vent A Hood range hoods duct out the top and can be back vented only by use of transitions and or elbows Transition Heights VP513 6 Round 8 1 2 Tall When Adjusted To 90 Degrees VP515 8 Round 10 3 4 Tall When Adjusted To 90 Degrees VP561 8 Round To 6 x 8 1 2 Rectangular 7 Tall B400 Blower Outlets With 2 VP561s Installed Back View B400 Blower Outlet...

Страница 14: ...ound VP527 7 Round VP528 8 Round MODEL DESCRIPTION PRICE VP554 10 Round MODEL DESCRIPTION PRICE VP555 12 Round MODEL DESCRIPTION PRICE VP538 6 x 8 1 2 VP560 3 1 4 x 10 MODEL DESCRIPTION PRICE VP539 6 Round VP540 7 Round VP541 8 Round MODEL DESCRIPTION PRICE VP552 10 Round VP553 12 Round MODEL DESCRIPTION PRICE VP539 HP 6 Round VP540 HP 7 Round VP541 HP 8 Round MODEL DESCRIPTION PRICE VP552 HP 10 R...

Страница 15: ... BLOWER SWITCH KNOB P1450 M LINE LIGHT SWITCH P1455 M LINE LIGHT SWITCH KNOB P1456 M600 WIRING HARNESS P1457 M1200 WIRING HARNESS LIGHT BULBS PART NO DESCRIPTION PRICE P1110 GU10 HALOGEN BULB 50 WATT P1120 F15 T8 FLUORESCENT BULB 15 WATT P1130 PAR20 HALOGEN BULB 50 WATT LIGHT FIXTURE COMPONENTS PART NO DESCRIPTION PRICE P1101 SP2 BALLAST NEWER HOODS P1103 LEFT LAMPHOLDER P1104 RIGHT LAMPHOLDER P11...

Отзывы: