![Venmar Jazz VJ604302SS Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/venmar/jazz-vj604302ss/jazz-vj604302ss_installation-manual_864725005.webp)
Make sure power is switched off at service panel before
starting installation.
1. Construct wood wall framing that is flush with surface of wall studs.
Make sure:
a) the framing is centered over installation location
b) the height of the framing will allow the
mounting bracket
to be
secured to the framing within the dimensions shown.
2.
After wall surface is finished
, carefully center and level the hood
mounting bracket, secure it to wall framing with 3 no. 8 x 1½”
mounting screws. Tight the screws completely.
-5-
WARNING
!
WARNING
When cutting or drilling into wall, do not damage electrical
wiring and other hidden utilities.
!
6. INSTALL UPPER FLUE MOUNTING BRACKET
Center the bracket over the hood location and place it flush with the ceiling.
Make sure that the slots of the upper flue bracket point down. Use the
upper flue mounting bracket as a template to mark the position of its
screws.
Drill both screw holes using a 5/16” drill bit. Insert the included drywall
anchors into the drilled holes (one per hole).
Secure the upper flue bracket to the wall using 2 no. 8 x 1½” mounting
screws. Make sure that the bracket is tight against the wall.
C
L
HD0247
HD0254A
5. INSTALL HOOD MOUNTING BRACKET
C
ENTER OF
INSTALLATION
C
EILING
U
PPER FLUE MOUNTING
BRACKET SLOTS
M
OUNTING BRACKET
FLUSH WITH CEILING
WALL STUDS
38 5/8” =
BOTTOM OF HOOD
26”
ABOVE COOKTOP
42 5/8” =
BOTTOM OF HOOD
30”
ABOVE COOKTOP
F
RAMING BEHIND
DRYWALL