
VEMCO - VR2 Manual
15
IMPORTANT
: Cut the cable ties when removing a VR2 from the mooring line. DO NOT re-use
cable ties. Use only new cable ties when deploying a VR2 receiver.
Wrap a third cable tie around the VR2 receiver and the rope so the
cable tie occupies the top half of the lower groove in the VR2 body.
The bottom half of the groove is already occupied by the cable tie
from Step 5
Latch the cable tie so the head of the cable tie is over the rope.
STEP 6
Wrap a fifth cable tie
around the VR2 receiver
and the rope so the cable
tie occupies the bottom
half of the groove used in
Step 7. Latch the cable
tie so the head of the
cable tie is over the rope.
STEP 8
Open the warp in the rope
next to the groove closest
to the hydrophone and
slide another cable tie
through rope so it lines up
with the top half of that
groove.
Tighten the cable tie so
the tie’s head is next to
the rope.
STEP 7
Trim the cable ties so there is no excess cable tie material and no sharp edges.
STEP 9
Through Rope
Around Rope
Through Rope
Around Rope