
Ins tallation Ins tructions
2
.
w w w . v e l o d y n e . c o m
SC-ICG (In-Ceiling Grille) User’s Manual
R e t r o f i t
1. Determine the center position for the subwoofer installation location.
2. Puncture a small hole through the ceiling material at the corresponding driver
center location.
Figure 1. Position the SC-600 In-Ceiling template on desired installation location.
3. Center the SC-ICG cut-out template to the hole created in the previous step.