![Velocity 49 Series Скачать руководство пользователя страница 49](http://html2.mh-extra.com/html/velocity/49-series/49-series_installation-operating-and-service-instructions_3939428049.webp)
49
111368-04 - 1/22
Series 49
Installation, Operating & Service Instructions
15
Troubleshooting
1. Troubleshooting should be completed by
a qualified installer, service agency or gas
supplier.
2. Before seeking technical assistance, the
qualified installer, service agency or gas
supplier should have an electrical meter and
gas pressure gauge available for use.
3. Check electrical connections on boiler before
proceeding. See Figures 9-1, 9-3 or 9-5.
A. Ensure 120VAC power polarity is correct,
and boiler is properly grounded.
B. Ensure control power supply 24VAC
(minimum 18VAC - maximum 30VAC)
polarity is correct.
4. Do not insert meter probes into wiring harness
pins. Doing so may damage pin,
resulting in loose connection when harness
is reconnected.
5. Refer to Figures 15-1, 15-2 or 15-3 for
Troubleshooting Flow Diagrams.