background image

Test & connection 

 

Turn RV1 completely to the left (minimal position) and RV2 completely to the right. 

 

Switch the power on.  

 

 

BE CAREFUL: 

a large part of the circuit is under mains power, do not touch it! 

 

 

Adjust RV2 so that the motor will have the lowest speed. It is important for the motor to start at any time, 
even where RV1 is put in its minimal position, otherwise there might be large currents causing sparks 
that burn the carbon brushes. 

 

 

NOTE: 

If the torque is poor, swap the two wires, connected to "VAC", mutually. The connections to 

"MAINS" must remain un-changed! 

Test & connection 

 

Turn RV1 completely to the left (minimal position) and RV2 completely to the right. 

 

Switch the power on.  

 

 

BE CAREFUL: 

a large part of the circuit is under mains power, do not touch it! 

 

 

Adjust RV2 so that the motor will have the lowest speed. It is important for the motor to start at any time, 
even where RV1 is put in its minimal position, otherwise there might be large currents causing sparks 
that burn the carbon brushes. 

 

 

NOTE: 

If the torque is poor, swap the two wires, connected to "VAC", mutually. The connections to 

"MAINS" must remain un-changed! 

Содержание K2636

Страница 1: ...er points 95 Difficulty level beginner 1 2 3 4 5 advanced Easy speed control of AC collector motors UNIVERSAL AC MOTOR CONTROL K2636 ILLUSTRATED ASSEMBLY MANUAL H2636IP 1 Total solder points 95 Diffic...

Страница 2: ...te adjustment for the lowest speed Anti RF interference circuit included Dimensions 120 x 75 x 41mm 2 Features Specifications This kit is especially designed to control the speed of drills or any othe...

Страница 3: ...d Always look for possible last minute manual updates indicated as NOTE on a separate leaflet 0 000 3 Assembly hints 1 Assembly Skipping this can lead to troubles Ok so we have your attention These hi...

Страница 4: ...olour code for the resistances and the LEDs on our website http www velleman be common service aspx 4 Assembly hints 1 3 Soldering Hints 1 Mount the component against the PCB surface and carefully sol...

Страница 5: ...0 B 9 R13 27 2 7 0 B 9 R14 390K 3 9 4 B 9 4 Metal film resistors R RV2 100K 6 Trim potentiometer R 5 Construction C3 100nF 104 5 Capacitor D1 1N4007 D2 1N4007 D3 1N4148 D4 1N4148 D5 1N4148 D6 1N4148...

Страница 6: ...print 15 Transformer TRAFO LD1 3mm RED 13 LED LD CATHODE VAC 2p LOAD 2p MAINS 2p 10 Terminal blocks 6 Construction T1 BC547B T2 BC547B T3 BC547B T4 BC517 7 Transistors C1 470 F C2 1 F 9 Electrolytic C...

Страница 7: ...a M3 bolt and nut Now the triac may be soldered 16 Triac mm 3 BOLT M3 NUT LOCK WASHER 10mm M3 BOLT 7 Construction TR1 BT137F 600 Place the heatsink and the triac on the PCB Fix the two components wit...

Страница 8: ...rcuits fits for regulations in swimming pools outdoors ect 17 Test connection Fig 1 0 N L N L N L M 8 M 110 240VAC MAINS LOAD VAC N L L N L N Test connection ATTENTION A PART OF THE CIRCUIT IS ALWAYS...

Страница 9: ...s poor swap the two wires connected to VAC mutually The connections to MAINS must remain un changed 9 Test connection Turn RV1 completely to the left minimal position and RV2 completely to the right S...

Страница 10: ...10 PCB PCB 10 PCB PCB...

Страница 11: ...11 Diagram Schematic diagram 1 F 470 F 11 Diagram Schematic diagram 1 F 470 F...

Страница 12: ...eirweg 33 9890 Gavere Belgium Europe www velleman be www velleman kit com 5 4 1 0 3 2 9 3 1 1 4 1 4 Modifications and typographical errors reserved Velleman Components nv H2636IP 2004 ED1 rev 2 VELLEM...

Отзывы: