
IG-032-EN version 05; 18/06/2019
10
Handling
General instructions
pfu basic range: Prefabricated concrete
enclosure, ground-level walk-in type
Two DEHA-type anchors are set out on each long side of
the body.
The body and roof can be handled together.
1
DEHA-type anchors
Figure 6.3.
Layout of DEHA anchors
Do this by proceeding as follows:
1. Join the tools and equipment. The lifting beam has a
series of numbered holes at the end for transverse
balancing. Table 6.1 shows the appropriate positions
for each model and the minimum height required from
the crane hook to the fl oor in order to lift the pfu. Hook
the lower slings/chains on the crane hook.
a. In the case of pfu-3, pfu-4 and pfu-5, join the tools
in accordance with Figure 6.4, without using the
elongation rings.
1
Cables
2
Lifting beam
2.1
Numbered holes for transverse balancing
3
Lower slings/chains with elongation ring and DEHA KA-type
hooks
Figure 6.4.
Lifting tools set for
pfu-3
,
pfu-4
and
pfu-5