![Vega SHLD 2 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/vega/shld-2/shld-2_operating-instructions-manual_3847507043.webp)
63138-US-200110
41
5 Commissioning the Source Holder
5.1 Commission the Source Holder
Depending on the source holder type and the specific license requirements, the
process of commissioning the source holder can include:
•
Inspecting the mounting supports
•
Testing the source holder for any source material leakage
•
Conducting open and closed radiation surveys
•
Performing an occupancy evaluation
Commissioning Call Checklist
In many installations, a VEGA Americas Field Service Engineer commissions the
gauge. To reduce service time and costs, use this checklist to ensure the gauge is
ready for commissioning before the engineer arrives:
•
Allow access to the source holder for testing purposes.
•
Have process ready for adjustment.
•
To ensure the most accurate measurement, a process adjustment is
necessary. This adjustment requires establishing and changing vessel levels.
If process material is not available, you may use water in most cases.
•
Do not remove the lock on the source holder.
•
Notify your Radiation Safety Officer or contact VEGA Americas Field
Service if there is damage to the source holder.
Commissioning a source holder is performed
only
by a specific
licensed individual trained in radiation safety.
See the
Radiation Safety Manual
for specific details.
!
NOTE
!
NOTE
Содержание SHLD 2
Страница 1: ...Operating Instructions SHLD 2 Source Holder Document ID 63138 Radiometric...
Страница 2: ......
Страница 8: ...6 63138 US 200110 NOTES...
Страница 12: ...10 63138 US 200110 NOTES...
Страница 26: ...24 63138 US 200110 NOTES...
Страница 42: ...40 63138 US 200110 NOTES...
Страница 56: ...54 63138 US 200110 NOTES...
Страница 68: ...66 63138 US 200110 NOTES...
Страница 78: ...76 63138 US 200110 9 2 Dimensions Figure 9 7 Source Holder SHLD 2 Standard Version...
Страница 79: ...63138 US 200110 77 Figure 9 8 SHLD 2 Beam Angles Figure 9 9 SHLD 2 Height for Source Exchange...
Страница 80: ...78 63138 US 200110 Figure 9 10 Source Holder SHLD 2 with Limit Switch...
Страница 81: ...63138 US 200110 79 Figure 9 11 Source Holder SHLD 2 with Interlock Safety Switch...
Страница 82: ...80 63138 US 200110 Figure 9 12 Source Holder SHLD 2 with Air Actuator...
Страница 83: ...63138 US 200110 81 Figure 9 13 Source Holder SHLD 2 with Air Actuator and Limit Switch...
Страница 84: ...82 63138 US 200110 Figure 9 14 Source Holder SHLD 2 Explosion Proof with Limit Switch...
Страница 86: ...84 63138 US 200110 NOTES...
Страница 87: ......