Vega B 53-19 Скачать руководство пользователя страница 13

13

6 Maintenance and fault rectification

B 53-19 • For the signal cable of conductive probes

40490-EN-220516

6  Maintenance and fault rectification

6.1 Maintenance

If the device is used properly, no special maintenance is required in 

normal operation.

6.2  Rectify faults

The operator of the system is responsible for taking suitable meas-

ures to rectify faults.

The first measure to be taken is to check the input/output signal as 

well as the power supply. In many cases, the causes can be deter-

mined and faults can be quickly rectified.
On-site repair of B53-19 is not possible. 

Should these measures not be successful, please call in urgent cases 

the VEGA service hotline under the phone no. 

+49 1805 858550

The hotline is manned 7 days a week round-the-clock. Since we offer 

this service worldwide, the support is only available in the English 

language. The service is free, only standard call charges are incurred.

Depending on the reason for the fault and the measures taken, the 

steps described in chapter " 

Setup

" must be carried out again or must 

be checked for plausibility and completeness. 

6.3  How to proceed if a repair is necessary

You can find an instrument return form as well as detailed information 

about the procedure in the download area of our homepage. By doing 

this you help us carry out the repair quickly and without having to call 

back for needed information.
In case of repair, proceed as follows:

• 

Print and fill out one form per instrument

• 

Clean the instrument and pack it damage-proof

• 

Attach the completed form and, if need be, also a safety data 

sheet outside on the packaging

• 

Ask the agency serving you to get the address for the return ship-

ment. You can find the agency on our homepage.

Reaction when malfunc-

tion occurs

Fault rectification

24 hour service hotline

Reaction after fault recti-

fication

Содержание B 53-19

Страница 1: ...Operating Instructions Overvoltage protection B 53 19 For the signal cable of conductive probes Document ID 40490...

Страница 2: ...rt and storage 7 4 Mounting instructions 8 4 1 Installation in switching cabinet 8 4 2 Mounting in housing 9 5 Connecting to power supply 11 5 1 Preparing the connection 11 5 2 Connection steps for ve...

Страница 3: ...rs to the Docu ment ID By entering the Document ID on www vega com you will reach the document download Information tip note This symbol indicates helpful additional information Caution If this warnin...

Страница 4: ...ith all prevailing regulations and directives The instrument must only be operated in a technically flawless and reliable condition The operator is responsi ble for the trouble free operation of the i...

Страница 5: ...nglish language Installations in the US shall comply with the relevant requirements of the National Electrical Code ANSI NFPA 70 Installations in Canada shall comply with the relevant requirements of...

Страница 6: ...3 19 1 Terminals Out protected side 2 Screw for carrier rail fastening 3 Terminals In unprotected side 4 Type label 3 2 Principle of operation Voltage surges can be caused by indirect atmospheric disc...

Страница 7: ...vironment friendly recyclable cardboard For special versions PE foam or PE foil is also used Dispose of the packaging material via specialised recycling companies Transport must be carried out in due...

Страница 8: ...or functional ground Depending on the version it may be galvanically connected to the ground terminal of the overvoltage arrester see circuit diagram in chapter Wiring plan The carrier rail must be co...

Страница 9: ...rester onto the rail and let it snap in 3 Tighten fixing screw 4 2 Mounting in housing The overvoltage arrester is optionally available in a plastic or alu minium housing Make sure when mounting that...

Страница 10: ...ervoltage protection 2 Pressure compensation 3 Ground terminal The carrier rail inside the housing is galvanically connected to the ground terminal outside on the housing This ground terminal must be...

Страница 11: ...using cover 2 Push the supply and connection cables through the cable gland into the housing strip approx 1 cm 0 4 in insulation from the ends of the wires 3 Connect the wire ends according to chapter...

Страница 12: ...le rod probe 1 Measuring probe 2 Overvoltage protection 3 Controller 4 Voltage supply 5 Potential equalisation 1 2 3 4 5 1 2 3 Typ B53 19 OUT IN IP 20 max 19VAC 27VDC 1A Li 0 5 mH Ci 3nF A1 A2 E1 E2 A...

Страница 13: ...s only available in the English language The service is free only standard call charges are incurred Depending on the reason for the fault and the measures taken the steps described in chapter Setup m...

Страница 14: ...der 7 2 Disposal Pass the instrument on to a specialised recycling company and do not use the municipal collecting points Remove any batteries in advance if they can be removed from the device and dis...

Страница 15: ...on Device for carrier rail mounting Housing material Plastic PPE Weight approx 175 g 0 385 lbs Electrical characteristics 1 Operating voltage 19 V AC Max perm current 1 A Ri per circuit 0 25 Response...

Страница 16: ...16 8 Supplement B 53 19 For the signal cable of conductive probes 40490 EN 220516 8 2 Dimensions B53 19 Overvoltage protection 84 mm 3 31 52 mm 2 05 25 mm 0 98 Fig 10 Dimensions B53 19...

Страница 17: ...40490 EN 220516 Housing 5 5 m m 0 22 86 mm 3 39 120 mm 4 72 160 mm 6 30 77 mm 3 03 47 mm 1 85 50 mm 1 97 4 5 m m 0 18 82 mm 3 23 68 mm 2 68 72 mm 2 84 130 mm 5 12 116 mm 4 57 M 20 x 1 5 M 20 x 1 5 1...

Страница 18: ...18 Notes B 53 19 For the signal cable of conductive probes 40490 EN 220516...

Страница 19: ...19 Notes B 53 19 For the signal cable of conductive probes 40490 EN 220516...

Страница 20: ...ing scope of delivery application practical use and operat ing conditions of the sensors and processing systems correspond to the information available at the time of printing Subject to change withou...

Отзывы: