Basic Test Procedure:
Make
FED
connections to the copper pair(s) under test and power on the
V-FED
.
Make MTTplus-522 connection to the copper pair(s) under test. Enter Loss and press
'Start'.
Use the arrow keys to scroll between the test points.
5.6.2 RFL with V-FED
FED Connections for RFL
Strap Function
: Red Banded Test Clips + Ground Clip
Communication with MTTplus-522
: Blue Banded Test Clips
5.6.3 Basic Test Procedure
Make FED connections to the copper pair(s) under test
Make MTTplus-522 connection to the copper pair(s) under test
Launch RFL. Press
FED ON
to turn on the far end
V-FED
. Then immediately Press FED STRAP to initiate the RFL test.
MTTplus-_Test_Module
Page 25 of 44