1
Introduction
This manual contains installation procedures for the TLS2 to TLS2P upgrade.
Contractor Certification Requirements
Veeder-Root requires the following minimum training certifications for contractors who will install and setup the
equipment discussed in this manual:
Installer (Level 1) Certification:
Contractors holding valid Installer Certification are approved to perform wiring
and conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wireless
equipment installation; tank and line preparation; and line leak detector installation.
TLS-350 Technician (Level 2/3 or 4) Certification:
Contractors holding valid TLS-350 Technician
Certifications are approved to perform installation checkout, startup, programming and operations training, system
tests, troubleshooting and servicing for all Veeder-Root TLS-300 or TLS-350 Series Tank Monitoring Systems,
including Line Leak Detection and associated accessories.
Warranty Registrations
may only be submitted by selected distributors.
Related Manuals
577013-959
TLS2P Site Prep and Installation Manual
577013-960
TLS2P Setup & Operators Manual