
Table of Contents
iv
Wiring Run Through Rigid Conduit
.....................................................................26
Connecting Wiring to the TLS-IB
............................................................................................28
Probe Wiring Positions and Labeling
..................................................................28
Connecting Probes to the TLS-IB
................................................................................28
....................................................................................29
...............................................................................29
Connecting IFSF Wiring to TLS-IB
...............................................................................30
Connecting Serial Communication Wiring to the TLS-IB
..............................................31
Connecting Power Wiring to TLS-IB
.............................................................................32
............................................................................................34
PROM Chip Replacement (Software Upgrade)
............................................................35
Replacing the Power Supply Board
.............................................................................37
When to Replace the Power Supply Board
.........................................................37
How to Replace the Power Supply Board
...........................................................37
.................................................................................................38
.................................................................................................39
.......................................................................................39
...............................................................................................39
................................................................................................39
Optional RS-232 Serial Interface
.................................................................................40
...........................................................................................41
..............................................................................................41
Figures
Control Drawing Showing an Example TLS-IB System Site Layout...........3
Typical Tank Lid Access Chamber Installation
.......................................7
Tank Lid Access Chamber — Critical Dimensions
.................................7
......................................................................8
Minimum clearance above probe canister
..............................................8
Probe canister sleeve kit installation
.......................................................9
Canister clearance for 2-inch entries
......................................................9
Dimensions needed to calculate custom probes and risers
The Veeder-Root Riser Cap Assembly and Fitting Tool
PTB Compliant Installation of a Mag Probe
..........................................11
....................................................................13
TLS-IB Dimensions and Designated Conduit Knockouts
Calculating the Correct Mag Probe Length
...........................................19
Standard and Custom Mag Probe Lengths
..........................................19
Mag Probe AST Installation Kit
.............................................................20
..........................................................................21
.........................................................................22
Modifying an existing metal riser cap
....................................................22