VPS Installation
This manual contains instructions to install a Veeder-Root (In-Station Diagnostic) Vapor Pressure Sensor (VPS) in
the dispenser vapor return line or in a vapor vent stack enclosure.
For a VPS sensor that will be direct wired to a TLS console, this manual assumes all preliminary site preparation is
completed, and that wiring from the console to a VPS intrinsically-safe junction box is in place and meets the
requirements set out in the appropriate console Site Prep manual.
For wireless VPS sensor installations, follow the steps herein to install the VPS sensor itself, but refer to manual
577013-964 for installation of, and connection to, the wireless components.
Installation of the VPS on the vapor vent stack is only allowed at facilities equipped with a
“Veeder-Root Vapor Polisher” or “Franklin Fueling System Healy Clean Air Separator.
Contractor Certification Requirements
Veeder-Root requires the following minimum training certifications for contractors who will install and set up the
equipment discussed in this manual:
All service personel on site must comply with all recommended safety practices identified by OSHA and your employer.
Review and comply with all the safety warnings in this an any related documents, and any other Federal, State, or Local
requirements
Warranty Registrations
may only be submitted by selected Distributors.
Veeder-Root Contractor
Certification Requirements
Installer
Certification
6
ATG Technician
Certification
7
VR Vapor Products
Certification
8
TLS-450PLUS
EVR for CA
Certification
Install
1
ISD
X
X
X
X
Install PMC
X
X
X
X
Install CCVP
X
X
X
X
Install Wireless ISD/PMC
X
X
X
X
Installation Checkout
2
X
X
X
ATG Startup
3
/ Training
4
/ Service
5
X
X
X
ISD Startup / Training / Service
X
X
PMC Startup / Training / Service
X
X
CCVP Startup / Training / Service
X
X
Wireless ISD/PMC Startup / Training / Service
X
X
Install Pressure Sensor (ATG)
X
X
X
X
Maintain Pressure Sensor (ATG)
X
X
X
Calibrate Pressure Sensor (ATG)
X
X
X
Clear ATG Pressure Sensor Alarm (ATG)
X
X
X
Clear ISD/PMC Alarms (ISD/PMC)
X
X
1
Perform wiring and conduit touting; equipment mounting
2
Inspect wiring and conduit routing; equipment mounting
3
Turn power on, program and test the systems
4
Provide supervised field experience in service techniques and operations
5
Troubleshoot and provide routing maintenance
6
UST Monitoring Systems – Installer (Level 1)
7
Certified UST Monitoring Technician
8
VR Vapor Products