EMR3 Truck Installation
Installation Procedures - Fuel Oil Truck Application
9
2B threads) mounting holes in the base of the Display Head’s housing. You may have to rotate the Display
Head right or left a little to line up the holes. Replace the mounting bolts and tighten them securely.
Figure 5. Display head mounted on TCS 682 piston meter
Figure 6. Completed TCS 682 piston meter installation
TCS Adapter
EMR 3 Encoder Shaft
TCS Shaft
Top of TCS meter housing
START
FINISH
MODE
PRESET
NEXT
ENTER
VOLUME
CURRENCY
RATE
SETUP
Pin P/N 510105-177
Insert pin through
coupling and shaft
START
FINISH
MODE
PRESET
NEXT
ENTER
VOLUME
CURRENCY
RATE
SETUP
START
FINISH
MODE
PRESET
NEXT
ENTER
VOLUME
CURRENCY
RATE
SETUP
Coupling
P/N 065004-005
1
2
3
emr3/alignpinstcs to dh.eps
START
FINISH
MODE
PRESET
NEXT
ENTER
VOLUME
CURRENCY
RATE
SETUP
emr3/tcs682.eps
Содержание EMR3 XStream-PKG
Страница 1: ...Manual No 577013 758 Revision I Installation Guide EMR3 ...
Страница 29: ...EMR3 Truck Installation C C Mode Switch Options 24 Figure 18 Display head cable connections ...
Страница 67: ......
Страница 68: ...For technical support sales or other assistance please visit www veeder com ...