background image

zeroing successfully. 

*  Grounding  first  and  then  press  “ZERO”  key  about  two 

seconds  and  avoid  objects  with  electricity  to  zero.  After 

un-pressing  the  key,  the  meter  sounds  and  displays  0  if 

zeroing successfully. 

*  Connect  the  conductor  to  the  “Ground  of  the  meter”  first 

and then press “ZERO” key about two seconds and test the 

conductor  to  zero.  After  un-pressing  the  key,  the  meter 

sounds and displays 0 if zeroing successfully. 

       

For example: one hand handholds the meter and put the 

other hand as conductor in front of the meter to zero.   

 

3 The zeroed method of the ion balance testing: 

Insert the ion balance testing plate firstly and then connect the 

“front  testing  plate”  to  the  “Ground  of  the  meter”.  Press 

“ZERO” key about two seconds to zero. After un-pressing the 

key, the meter sounds and displays 0 if zeroing successfully. 

 

4.3  switch  between  the  static  testing  and  the 

ion balance testing 

1  the  meter  runs  into  the  static  testing  after  switching  on  the 

power supply. 

2  press  “

STATIC/IB

”  key  to  the  ion  balance  testing  (display 

“IB”). 

3 press “

STATIC/IB

” key again to return to the static testing. 

4 press “

STATIC/IB

” key again to the ion balance testing. 

 

4.4 HOLD/MAX 

HOLD:

    keep  the  current  testing  value  for  recording  it.  And 

lock the functions of “STATIC /IB” and “ZERO” until 

exiting the HOLD process. 

               

ENTER: 

press “HOLD/MAX” key (less than 1.5s) to 

hold  process  (display  “HOLD”  after 

un-press the key). 

                EXIT:   

press  “HOLD/MAX”  key  to  exit  the  hold 

process (without display “HOLD”). 

 

press “

STATIC/IB

” key 

Static testing 

 

Ion balance testing

 

Page9 

Page8 

Содержание 496

Страница 1: ...TIC FIELDMETER OPERATION MANUAL Thank you for purchasing our electrostatic field meter Please carefully read this manual before operating the system Store this manual in a safe easily accessible place...

Страница 2: ...eplacing the fittings Please turn off the power supply when finishing using and take out the battery when not using in a period of time 1 Summary This electrostatic field meter is a special meter for...

Страница 3: ...place a new battery refer to the picture Note The meter can work about 12 hours continually when using a new battery And please turn off the power supply when not using Do not replace the new battery...

Страница 4: ...e ion balance testing board when testing or else the voltage in the front testing board will be eliminated 5 Replace the battery 1 means the voltage is full means the voltage is enough means the volta...

Страница 5: ...range low 0 1 50KV high 1 22 0KV Auto switch between low and high ion balance testing range 0 220V measure distance static 25mm 0 5mm 1 Insert the ion balance testing plate to the notch refer to the...

Страница 6: ...6 Ion Balance Testing Instructions P O W E R E L E C T R O S T A T IC M E T E R th e n o tch th e fro n t testin g p late th e b ack testin g p late in sert th e io n b alan ce testin g p late to th e...

Страница 7: ...working until displaying OFF th e tested o b ject g rap h em ic g ro u n d in g 2 5 m m E L E C T R O S T A T I C F I E L D M E T E R P O W E R 1 Press power key to select the working mode and then g...

Страница 8: ...t it into the grounding hole of the meter The surface is ESD and it is Ground of the meter 2 Conductor the resistance of the meter is high and the body water wet some things earth and some wall are co...

Страница 9: ...g plate to the Ground of the meter Press ZERO key about two seconds to zero After un pressing the key the meter sounds and displays 0 if zeroing successfully 4 3 switch between the static testing and...

Отзывы: