background image

 

Mode1 

Mode 2 

Mode 3 

Mode 4 

Pressing 

“power” 

time 

1s-2.5s 

2.5s-3.5s 

3.5s-4.5s 

4.5s-5s 

LCD 

display 

1

 

display 

2

and

EL

 

display 

3

and

A.ON

 

display 

4

EL

and

A.ON

 

Sound 

di 

di 

di-di-di 

di-di-di 

Mode 

state 

Turn off the power 

supply after working 

five minutes. 

Continuous work and not 

turn off the power supply 

automatically (A.ON). 

 

LCD 

without 

lighting 

LCD  with 

lighting 

(EL) 

LCD 

without 

lighting 

LCD  with 

lighting 

(EL) 

 

2  Manual  turns  off  the  meter:  press  the  “power”  key  when 

working 

until 

displaying 

“OFF”. 

 

t h e  t e s te d  

o b j e c t

" + "  g r a p h e m ic

g r o u n d i n g

2 5 m m

E L E

C T R

O S T

A T I

C   F

I E L

D M E

T E R

P O W

E R

 

1 Press “power” key to select the working mode and then go into 

the static testing process. 

2 Ground the meter. 

3 Avoid objects with electricity and then zero if the display is not 

zero value (refer to the 4.2).   

4 The front part of the meter is parallel to the tested object about 

25mm and the displaying value on the LCD is the static value 

carried  by  the  tested  object.  The  measure  distance  is  about 

25mm when seeing a clear red “+”on the tested object. 

5 Press “HOLD/MAX” key into hold process or max process 

 

Page6 

Page11 

Содержание 496

Страница 1: ...TIC FIELDMETER OPERATION MANUAL Thank you for purchasing our electrostatic field meter Please carefully read this manual before operating the system Store this manual in a safe easily accessible place...

Страница 2: ...eplacing the fittings Please turn off the power supply when finishing using and take out the battery when not using in a period of time 1 Summary This electrostatic field meter is a special meter for...

Страница 3: ...place a new battery refer to the picture Note The meter can work about 12 hours continually when using a new battery And please turn off the power supply when not using Do not replace the new battery...

Страница 4: ...e ion balance testing board when testing or else the voltage in the front testing board will be eliminated 5 Replace the battery 1 means the voltage is full means the voltage is enough means the volta...

Страница 5: ...range low 0 1 50KV high 1 22 0KV Auto switch between low and high ion balance testing range 0 220V measure distance static 25mm 0 5mm 1 Insert the ion balance testing plate to the notch refer to the...

Страница 6: ...6 Ion Balance Testing Instructions P O W E R E L E C T R O S T A T IC M E T E R th e n o tch th e fro n t testin g p late th e b ack testin g p late in sert th e io n b alan ce testin g p late to th e...

Страница 7: ...working until displaying OFF th e tested o b ject g rap h em ic g ro u n d in g 2 5 m m E L E C T R O S T A T I C F I E L D M E T E R P O W E R 1 Press power key to select the working mode and then g...

Страница 8: ...t it into the grounding hole of the meter The surface is ESD and it is Ground of the meter 2 Conductor the resistance of the meter is high and the body water wet some things earth and some wall are co...

Страница 9: ...g plate to the Ground of the meter Press ZERO key about two seconds to zero After un pressing the key the meter sounds and displays 0 if zeroing successfully 4 3 switch between the static testing and...

Отзывы: