34
GETTING TO KNOW YOUR ECS-9200/9100 GTX1050
©Vecow ECS-9200/9100 GTX1050 User Manual
Pin No.
function
Pin No.
function
51
Reserved
52
+3.3Vaux
49
Reserved
50
GND
47
Reserved
48
+1.5V
45
Reserved
46
Reserved
43
GND
44
Reserved
41
+3.3Vaux
42
Reserved
39
+3.3Vaux
40
GND
37
GND
38
USB_D+
35
GND
36
USB_D-
33
PETp0
34
GND
31
PETn0
32
SMB_DATA
29
GND
30
SMB_CLK
27
GND
28
+1.5V
25
PERn0
26
GND
23
PERp0
24
+3.3Vaux
21
GND
22
PERST#
19
Reserved
20
reserved
17
Reserved
18
GND
Mechanical Key
15
GND
16
UIM_VPP
13
14
UIM_RESET
11
REFCLK-
12
UIM_CLK
9
GND
10
UIM_DATA
7
CLKREQ#
8
UIM_PWR
5
Reserved
6
1.5V
3
Reserved
4
GND
1
WAKE#
2
3.3Vaux
Pin Out:
Содержание ECS-9100-GTX1050
Страница 54: ...47 HARDWARE INSTALLATION Step 3 Finish Step1 and 2 Step 4 Remove one KHS 6 32x6 screw Step 5 Open the module...
Страница 58: ...51 HARDWARE INSTALLATION Step 4 Open the CPU socket Be careful CPU pins Step 3 CPU socket...
Страница 65: ...58 HARDWARE INSTALLATION Vecow ECS 9200 9100 GTX1050 User Manual Step 3 Finish Step 4 Install SSD HDD...
Страница 66: ...59 HARDWARE INSTALLATION 3 8 Installing M 2 Step 2 Fasten one M3 screw Step 1 M 2 slot...
Страница 68: ...61 HARDWARE INSTALLATION Step 4 Lock two M2 screws with slot Step 3 Install M2DOM module with slot...