20
GETTING TO KNOW YOUR ECS-9200/9100 GTX1050
©Vecow ECS-9200/9100 GTX1050 User Manual
COM 3 & COM 4 MB connector table:
COM Port
MB Connector
COM Port
MB Connector
COM 3
CN9
COM 4
CN10
CN
Pin No.
Signal Name
CN9 (COM3)
CN10 (COM4)
1
Chassis GND
2
GND
3
RI
4
DTR
5
CTS
6
TXD
7
RTS
8
RXD
9
DSR
10
DCD
COM 3 & COM 4 MB connector pin out:
CN10
CN9
Содержание ECS-9100-GTX1050
Страница 54: ...47 HARDWARE INSTALLATION Step 3 Finish Step1 and 2 Step 4 Remove one KHS 6 32x6 screw Step 5 Open the module...
Страница 58: ...51 HARDWARE INSTALLATION Step 4 Open the CPU socket Be careful CPU pins Step 3 CPU socket...
Страница 65: ...58 HARDWARE INSTALLATION Vecow ECS 9200 9100 GTX1050 User Manual Step 3 Finish Step 4 Install SSD HDD...
Страница 66: ...59 HARDWARE INSTALLATION 3 8 Installing M 2 Step 2 Fasten one M3 screw Step 1 M 2 slot...
Страница 68: ...61 HARDWARE INSTALLATION Step 4 Lock two M2 screws with slot Step 3 Install M2DOM module with slot...