Installation
26
VideoJet 1000
Switching on/off
Mains connection
Included with the VideoJet 1000 is a power cable with the correct
matching plug.
The VideoJet 1000 is not provided with a power switch. The unit is
ready for operation as soon as the unit is connected to the power.
)
Insert the mains socket into the connector
Power
.
)
Connect the mains cable into an earthed socket.
The green LED
Power
on the front panel of the VideoJet 1000 lights
up, the unit is ready for operation.
If the network connection has also been established correctly, the
green
Ethernet
LED also lights up. A flashing yellow LED signals
the transport of data packages over the network.
Warning!
Ensure that the mains supply is free from interference such as over
voltages, spikes, or brownouts by using suitable mains conditioners
where necessary.
Only connect the VideoJet 1000 to the power source after all other
connections have been established.
Содержание VideoJet 1000
Страница 1: ...VideoJet 1000 Manual ...
Страница 8: ...Preface 10 VideoJet 1000 ...
Страница 20: ...Installation 22 VideoJet 1000 Mounting of a single unit Mounting of twin units ...
Страница 28: ...Installation 30 VideoJet 1000 ...
Страница 88: ...Operation 90 VideoJet 1000 ...
Страница 92: ...Maintenance and Upgrades 94 VideoJet 1000 ...
Страница 105: ...107 VideoJet 1000 ...