Form V453                                      - 9 -                                                Rev 2, ECN 4735 10/16/20 

INSTALLATION INSTRUCTIONS 

 

A. RECEIPT INSPECTION 

 

Prior  to  shipment  Vaughan  pumps  are 
carefully  crated  and  inspected  to  ensure 
arrival  at  your  site  in  good  condition.  On 
receiving  your  pump,  examine  it  carefully  to 
assure  that  no  damaged  or  broken  parts 
have  resulted  from  shipping  or  handling. 
Look  for  signs  that  the  pump  has  been 
dropped,  such  as  damaged  crating,  missing 
paint,  dented-in  flanges,  cracked  housings, 
or  leaking  oil.  Turn  the  pump  shaft  by  hand 
and  verify  that  it  turns  over  smoothly.  If  the 
shaft binds, look for debris  or paint  between 
impeller  and  suction  cone.  Otherwise,  shaft 
binding  could  indicate  damage.  If  damage 
has  occurred,  report  to  your  carrier 
immediately, and consult your local Vaughan 
representative  or  call  Vaughan  Co.  for 
advice.  Be  sure  to  remove  the  flange  cover 
at time of installation. 
 

B. STORAGE CONSIDERATIONS 

 
If  equipment  is  to  be  stored  for  longer  than 
two weeks, take the following action: 
 
1.  Coat  exposed  steel  with  a  light  layer  of 

grease  or  Cosmoline  to  protect  the 
equipment from corrosion. 

2.  Rotate  the  motor  1/4  turn  once  each 

month  to  keep  the  bearings  from  sitting 
in  one  position  for  extended  periods  of 
time. 

3.  Avoid  storing  rotating  equipment  near 

other 

vibrating 

equipment. 

The 

vibrations can damage the ball bearings 
and  result  in  premature  failure  once the 
equipment is started up. 

4.  Store rotating equipment in a clean, dry, 

heated  area  away  from  areas  where  it 
could be damaged from impact, smoke, 
dirt, vibration, corrosive fumes or liquids, 
or from condensation inside the motor or 
pump.  It  may  be  helpful  to  cover 
equipment with plastic. 

5.  The  pump  column  and  bearing  housing 

are  assembled  as  an  oil-filled  assembly 

so  that  the  seal  and  lower  bearings  are 
covered  in  oil.  To  avoid  bearing 
corrosion these housings should be kept 
filled  with  ISO  Grade  46  hydraulic  oil  to 
normal levels. (Note that the top bearing 
is  grease  lubricated.  An  air  gap  should 
be  left  below  the  top  two  bearings.  Do 
not over fill.) 

 

C. PUMP MOUNTING 

 

The  Vaughan  wet-well  pump  is  heavy  and 
will require a crane to lift it into position over 
your  pit.  Lifting  the  pump  by  the  lifting  eyes 
on  the  deck  plate  is  the  only  recommended 
method  for  lifting.  If  the  pump  is  long,  it's 
advisable  to  support the  center  of the  pump 
column during lifting to avoid bending any of 
the stem sections. 

Do not lift by the motor 

lift eye.

 

 
When  locating  the  pump  in  the  pit,  position 
the pump so that the lower  pump  casing (or 
volute) is located at least 12" away from the 
nearest  vertical  wall  in  the  pit.  Pump  length 
should  have  been  chosen  so  that  the  pump 
inlet is located about 12" above the pit floor. 
Smaller 3" and 4" pumps may be located no 
closer  than  6"  from  the  floor  as  a  minimum. 
Mounting the pump intake too close to the pit 
floor can cause vibrations and keep material 
from getting into the pump.  
 
The  pump  deck  plate  should  be  bolted  or 
clamped  to  the  upper  deck  or  floor  to 
minimize  operational  vibrations.  Vaughan 
Co.  typically  recommends  ½"  expansion-
type  anchors  for  use  in  concrete  for  pumps 
3-6"  discharge  size,  ¾"  anchors  for  8-12" 
size pumps. 
 
The  exact  details  of  your  pump,  (i.e.,  parts 
breakdown,  outline  dimensions,  and  weight) 
are  available  from  Vaughan  Co.  The 
illustration  on the next page  shows a typical 
wet-well pump installation. 

 

Содержание Triton Series

Страница 1: ...ICAL WET WELL TRITON SCREW PUMPS INSTALLATION OPERATION MAINTENANCE MANUAL VAUGHAN CO INC 364 Monte Elma Road Montesano WA 98563 Phone 1 360 249 4042 Fax 1 360 249 6155 Toll Free Phone US only 1 888 249 CHOP 2467 Web Site www chopperpumps com ...

Страница 2: ...FORM V453 2 Rev 2 ECN 4735 10 16 20 Company E mail info chopperpumps com ...

Страница 3: ... of Vaughan Pumps 3 INSTALLATION INSTRUCTIONS Page 9 A Receipt Inspection B Storage Considerations C Pump Mounting D Piping E Motors and Controls F Auto Oil Level Monitor 4 STARTUP INSTRUCTIONS Page 11 5 STARTUP CERTIFICATION CHECKLIST Page 12 6 NORMAL OPERATION OF PUMP Page 14 A Noise B Vibration C Motor Overloads D Oil Usage 7 SHUTDOWN INSTRUCTIONS Page 14 A Manual Shutdown B Automatic Shutdown ...

Страница 4: ...ically ordered for this purpose Introducing non explosion proof equipment into a hazardous environment as defined by the National Electrical Code can cause a dangerous explosion DANGER Keep hands feet and clothing away from moving machinery DANGER Do not allow people under or near the pump assembly while it is being lifted DANGER Enter tanks or pits with extreme caution and only when using a self ...

Страница 5: ...properly sized and rated lifting equipment Consult Vaughan Co shipping department for weight of your equipment if you are in doubt CAUTION Do not operate this equipment unless safety guards or devices are in place and properly adjusted CAUTION Shut pump off when adjusting fittings to avoid being sprayed with pumpage Pumped materials may be hot corrosive poisonous infectious or otherwise dangerous ...

Страница 6: ...loading the drive motor The standard inlet suction cone is made of ductile cast iron Other available materials are chrome iron 316SS and CD 4MCu UPPER CUTTER The upper cutter ring it is screwed into the pump casing with LH threads uses two cutting dogs to cut against cast in teeth located on the rotating impeller hub The upper cutter is only a feature on 4X6A 6X6A 8X8B 10X10C and 12X12C Triton scr...

Страница 7: ...controls setup for the auto oil system is shown below Also shown is a cross section of the oil reservoir and float switch MOTOR MOUNTING Vaughan wet well pumps can be belt driven call Vaughan Co for an exploded parts assembly drawing showing this configuration but most pumps are directly driven by an induction type AC electric motor Direct drive pumps use a C Face or metric B5 flange mounted motor...

Страница 8: ...pump suction valve 5 When pumping liquid containing debris that floats or settles in a pit mixing with the pump may be required before pit pumpout This can be done by initially directing the discharge back into the pit using a 3 way valve system available from Vaughan Co 6 Slurry that is too hot cannot be pumped from an open pit A reasonable limit at 1170 RPM is about 180 F at 1750 RPM it s about ...

Страница 9: ...densation inside the motor or pump It may be helpful to cover equipment with plastic 5 The pump column and bearing housing are assembled as an oil filled assembly so that the seal and lower bearings are covered in oil To avoid bearing corrosion these housings should be kept filled with ISO Grade 46 hydraulic oil to normal levels Note that the top bearing is grease lubricated An air gap should be l...

Страница 10: ...ardous location be sure you ordered and received your pump with an explosion proof motor and that you use an electrician experienced in hazardous environment wiring and controls Vaughan Chopper Pumps because they cut and condition the material they pump require motor protection with correctly sized breakers starters and overload protection A Chopper Pump can jam and stall on material too tough to ...

Страница 11: ...the factory with oil but once the pump is installed in your pit it may need additional oil to make sure the oil monitor switch is covered with oil DO NOT OVERFILL as this will wash grease out of the upper bearings add only enough to cover the switch plus 1 3 Do not completely fill the pump column with oil Fill only until the float switch is covered with oil plus one additional inch The pump requir...

Страница 12: ...Form V453 12 Rev 2 ECN 4735 10 16 20 ...

Страница 13: ...Form V453 13 Rev 2 ECN 4735 10 16 20 ...

Страница 14: ...evel at startup If the pump uses large amounts of oil or if the oil is contaminated mechanical seal damage may have occurred Verify that the pump has not been flooded from the top If the seal is leaking the unit should be repaired immediately to avoid more expensive repairs later Call Vaughan Co immediately for advice Vaughan Co can send out a bearing and seal system sub assembly or a new seal ove...

Страница 15: ...wable amperage to the motor at full load QUARTERLY 1 Motor Inspect electric motor Make sure that casing drain is not plugged to ensure that motor cannot fill up with water Clean cooling fins so that dirt buildup will not affect cooling ability of motor Check for loose hardware and damaged wiring or conduit 2 Pump Inspect pump for loose hardware Disconnect power to the Auto OLM and check the oil to...

Страница 16: ...Form V453 16 Rev 2 ECN 4735 10 16 20 ...

Страница 17: ...limited to claims for property damage personal injury attorneys fees lost profits loss of use liability of Purchaser to customers loss of goodwill interest on money withheld by customers damages related to third party claims travel expenses rented equipment third party contractor s fees or unauthorized repair service or parts The Purchaser by acceptance of delivery assumes all liability for the co...

Страница 18: ... 21 Per Joe Removed Vaughan Co Ships wet well pumps with a pressure gauge installed in this pressure tap so that you can measure the actual operating conditions of the pump during startup Replaced with for installation of pressure gauge for testing purposes particularly important at pump startup 10 14 21 LMN ...

Отзывы: