Pax-i3D Smart(PHT-30LFO) Installation Manual
64
4 Installing the Equipment: Floor Standing (Optional)
4.7
Leveling the Equipment
8mm / 0.3"
T-shaped hex wrench
Spirit level
Ensure that the spirit level should restonly on the locations indicated in
the following figures to obtain the accurate center.
1.
Prepare the spirit level.
Tube head
2.
Position the rotating unit so that the X-Ray
tube head faces the front.
3.
Turn all eight screws on the base plate unit
clockwise until they touch the ground.
Содержание PaX-i3D Smart
Страница 1: ...PHT 30LFO HARDWARE and SOFTWARE E n g l i s h Installation Manual Version 1 0 0...
Страница 2: ......
Страница 3: ......
Страница 72: ...This page is intentionally left blank...
Страница 82: ...This page is intentionally left blank...
Страница 92: ...This page is intentionally left blank...
Страница 137: ...10 Technical Specifications...
Страница 139: ...Pax i3D Smart PHT 30LFO Installation Manual 139 10 Technical Specifications Dimension of equipment PANO CT Unit mm...
Страница 140: ...Pax i3D Smart PHT 30LFO Installation Manual 140 10 Technical Specifications PANO CT CEPH Unit mm...
Страница 141: ...Pax i3D Smart PHT 30LFO Installation Manual 141 10 Technical Specifications PANO CT CEPH OneShot type Unit mm...
Страница 145: ...Pax i3D Smart PHT 30LFO Installation Manual 145 Appendix Schematic diagram Components supplied...
Страница 160: ......
Страница 161: ...13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea Postal Code 445 170...