background image

 

 

2.1.1.  Overhead installation

 

 

 

Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and 
EN60598-2-17 
 

The suspension devices have to be build and measured so they can withstand for an hour the tenfold 
of the payload without suffering a permanent detrimental deformation.
 
Basically installation has to be made by using a second separate suspension. This can be e.g. a 
suitable net. The second suspension must be designed and attached so no part of the installation can 
fall down in case of failure. 
 
During construction, reconstruction and deconstruction unnecessary stay in the range of moving 
areas, on lightning bridges, under elevated
 
The operator is obliged to following safety
 

Before  the  first  start-up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 
expert. 

 

Review in the frame of the inspection test at least all four years by an expert.  .

 

Review by a qualified person at least once a year. 

 
How to carry out the overhead installation:
In tidal fall you should install the device out of the lounge area of people
 
IMPORTANT! Overhead installation requires a high level of experience. This includes knowledge of 
calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience is not limited to t
yourself under any circumstances if you are not qualified. Contact a professional installer. An 
inappropriate installation can lead to injuries and/or damaged properties. 
 
It is not allowed to install the device i
 
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 
The device may not be installed so it can swing freely in the room. 
 
Please note: Crashing down items can cause serious injuries
the safety of a possible installation form!
 
Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 
the own weight of the device. 
 
Mount the device with the mounting
 
During overhead installation the device must be always secured by a safety rope which is designed to 
hold the twelvefold weight of device. Only safety ropes with quick
may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 
truss or an appropriate fastening point. Hang up the end in the fastening element and tie up the 
locking nut. A safety rope once exposed to fai

5 / 16 

Overhead installation 

Danger of life! 
You have to observe the regulations of BGV C1 (formerly VBG 70) and 

17 Installations are to carry out by skilled personnel only.

e to be build and measured so they can withstand for an hour the tenfold 

of the payload without suffering a permanent detrimental deformation. 

Basically installation has to be made by using a second separate suspension. This can be e.g. a 

The second suspension must be designed and attached so no part of the installation can 

During construction, reconstruction and deconstruction unnecessary stay in the range of moving 
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden. 

The operator is obliged to following safety-related and mechanical facilities:  

up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 

the frame of the inspection test at least all four years by an expert.  .

Review by a qualified person at least once a year.  

How to carry out the overhead installation: 
In tidal fall you should install the device out of the lounge area of people 

Overhead installation requires a high level of experience. This includes knowledge of 

calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience is not limited to this. Do not try to carry out installation 
yourself under any circumstances if you are not qualified. Contact a professional installer. An 
inappropriate installation can lead to injuries and/or damaged properties.  

It is not allowed to install the device in the grip area of people. 

If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 
The device may not be installed so it can swing freely in the room.  

Please note: Crashing down items can cause serious injuries! Do not install the projector, if you doubt 
the safety of a possible installation form! 

Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 

unting-bracket to your trussing system using an appropriate clamp. 

During overhead installation the device must be always secured by a safety rope which is designed to 
hold the twelvefold weight of device. Only safety ropes with quick-release safety fast
may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 
truss or an appropriate fastening point. Hang up the end in the fastening element and tie up the 
locking nut. A safety rope once exposed to failing load or damaged may not be used furthermore. 

You have to observe the regulations of BGV C1 (formerly VBG 70) and 

Installations are to carry out by skilled personnel only. 

e to be build and measured so they can withstand for an hour the tenfold 

Basically installation has to be made by using a second separate suspension. This can be e.g. a 

The second suspension must be designed and attached so no part of the installation can 

During construction, reconstruction and deconstruction unnecessary stay in the range of moving 

work stations or any other danger zones is forbidden.  

up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 

the frame of the inspection test at least all four years by an expert.  . 

Overhead installation requires a high level of experience. This includes knowledge of 

calculating the payload, used installation material and safety inspections of the used material and the 

his. Do not try to carry out installation 

yourself under any circumstances if you are not qualified. Contact a professional installer. An 

If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 

! Do not install the projector, if you doubt 

Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 

bracket to your trussing system using an appropriate clamp.  

During overhead installation the device must be always secured by a safety rope which is designed to 

release safety fastener elements 

may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 
truss or an appropriate fastening point. Hang up the end in the fastening element and tie up the 

ling load or damaged may not be used furthermore.  

Содержание LED Accu Pad 7

Страница 1: ...Manual LED Accu Pad 7 7x10 W RGBWAUV white ...

Страница 2: ...allation 5 2 Introduction 7 2 1 Product overview 7 2 2 Battery 8 2 2 1 Battery charging 8 2 2 2 Service 8 3 Connections 9 3 1 Electrical connections 9 3 2 DMX connections 9 3 3 DMX connection with terminator 9 4 Control 10 4 1 Structure of the menu 10 4 2 Master Slave 11 4 3 Wireless DMX 11 4 4 IR remote 12 5 DMX chart 13 5 1 DMX mode 1 1 channel 13 5 2 DMX mode 2 2 channels 13 5 3 DMX mode 3 8 ch...

Страница 3: ...tuner TV set and amplifier To avoid placing on un stable location Select a level and stable location to avoid vibration Do not use chemicals or volatile liquids for cleaning Use a clean dry cloth to wipe off the dust or a wet soft cloth for stubborn dirt If out of work contact sales agency immediately Any troubles arose remove the power plug soon and contact with an engineer for repairing do not o...

Страница 4: ... in closed motor vehicles You have to attend that with an ambient temperature von 40 C it is not allowed that the relative humidity exceeds 50 Operate the device not during thunderstorms Surge voltages could destroy the device Unplug the power supply during thunderstorms During the installation the use of the mounting bracket is obligatory Surrounding objects or surfaces should not be in contact w...

Страница 5: ... the frame of the inspection test at least all four years by an expert Review by a qualified person at least once a year How to carry out the overhead installation In tidal fall you should install the device out of the lounge area of people Overhead installation requires a high level of experience This includes knowledge of calculating the payload used installation material and safety inspections ...

Страница 6: ...e maximum drop exceed must not exceed 20cm A safety rope once exposed to failing load or damaged may not be used furthermore Adjust the desired inclination angle via the mounting bracket and tighten the screw ...

Страница 7: ... 16 3 Introduction Thank you for buying the LED Accu Pad 7 7x10 W RGBWAUV white It is a powerful device For a successful installation and operation please read this manual carefully 3 1 Product overview ...

Страница 8: ...ing the charge the battery indicators light up in sequence You can use the device during the charge Before you disconnect the device from the main it should be charged completely The device should be charged one time each three months if you do not use the device otherwise the volume of the battery will be cut down 20 3 2 2 Service ...

Страница 9: ...device the line has to be terminated In order to do this you have to solder a 120Ω resistor between the pins Data and Data You can solder this end resistor on a 3pin or 5pin XLR Plug this adapter into the DMX output of the device 4 3 DMX connection with terminator Where the DMX cable has to run a long distance or the equipment is operated in an electrically noisy environment like a disco for insta...

Страница 10: ...9 Choose one of 2 music programs The sensitivity of the microphone can be set in 99 steps MASt On Activates the master mode Off Deactivates the master mode ALLC 000 255 r000 r255 Here you can set an individual color with the help of red green blue white amber and UV g000 g255 b000 b255 U000 U255 A000 A255 L000 L255 bLnd No The LEDs are switched on Yes The LEDs are switched off Led On The display i...

Страница 11: ...ss DMX 1 Choose rELE in the menu and confirm with ENTER 2 Hold down the UP DOWN button until you reach 200 and you can read out YES 3 If you release the button the Wireless DMX indicator flashes one time The connection was successful Note The device stores the receiver If you power off and on again the device will automatic connect to the receiver If you use another receiver please make this conne...

Страница 12: ...12 16 5 4 IR remote 1 Choose rEno in the menu and confirm with ENTER 2 To activate the IR remote control please choose On and confirm with ENTER ...

Страница 13: ...5 Dimmer amber 0 100 7 0 255 Dimmer UV 0 100 8 0 8 No function 9 255 Strobe slow fast 6 4 DMX mode 4 11 channels Channels Value from Value to Function 1 0 255 Dimmer 0 100 2 0 255 Dimmer red 0 100 3 0 255 Dimmer green 0 100 4 0 255 Dimmer blue 0 100 5 0 255 Dimmer white 0 100 6 0 255 Dimmer amber 0 100 7 0 255 Dimmer UV 0 100 8 0 8 No function 9 255 Strobe slow fast Automatic programs 0 10 No func...

Страница 14: ...nge Fade Red Blue White Amber 111 120 Color change Fade Green Blue White 121 255 Color change music controlled 10 0 255 Set the program speed or the sensitivity of the microphone 11 0 127 Color change music controlled static 128 255 Color change music controlled Flash ...

Страница 15: ...Color spectrum RGBWAUV Power 70 W Number Power 7x 10 W Optics Beam angle 23 Others 2200 Lux 2m Connections Strom in IEC Strom out IEC XLR in out 3pin XLR Controlling Sound to light Yes Automatic Yes Master Slave Yes DMX512 1 2 8 11 channels DMX Wireless Yes IR IR remote Yes Hardware Protection class IP20 Dimensions L B H 251 x 260 x 200 mm Weight 3 4 kg ...

Страница 16: ...16 16 Importer B K Braun GmbH Industriestraße 2 D 76307 Karlsbad www bkbraun com info bkbraun com ...

Отзывы: