112
Subject to modification! Updated 06/2017
i
When exchanging a battery module, request
new hazardous goods packaging if required,
pack the battery module and have it picked up
by the supplier.
4.3
Packaging/transport control
DANGER
Installation of damaged components!
Mortal danger!
Do not accept clearly damaged
packaging.
Contact VARTA Storage.
Storage cabinet and battery module (individually packaged) are
delivered in separate and tested packaging units on pallets. The
disposal of the packaging will be taken over by the installation
engineer. Please examine the deliveries on completeness and
damages:
If damages are already visible at the packaging, please
note this down on the delivery documents and have the
driver confirm this by signature.
If the packaging is severely damaged, reject the
deliveries.
Содержание element Series
Страница 1: ...nderungen vorbehalten Stand 06 2017 Version 01 NACHR STANLEITUNG VARTA element VARTA Storage GmbH...
Страница 34: ...34 nderungen vorbehalten Stand 06 2017 Abbildung 2 VARTA element Batteriemodul...
Страница 78: ...78 Si riserva il diritto di apportare modifiche Versione 06 2017 Figura 2 modulo batteria elemento VARTA...
Страница 89: ...Subject to modification Updated 06 2017 Version 08 ADD ON INSTRUCTIONS VARTA element VARTA Storage GmbH...
Страница 122: ...122 Subject to modification Updated 06 2017 Figure 2 VARTA element battery module...