20
Step 3: CAN cables
Connect the CAN cables. Tighten it with a torque of max 0.6 Nm. Connect always modules next to
each other (see below picture).
Step 4: CAN termination resistor
Connect the CAN termination resistor. Please make sure that the system is terminated at both
physical ends of the CAN Bus.
7.3
Configuration of a system
It is necessary under the following conditions:
1. If the modules are connected the very first time.
2. If one or more modules are replaced in an already configured system.
3. If new modules are added to an already configured system.
Connect the batteries as described in chapter 7.1 and 7.2.
Step 1: Turn on the system by pressing the button on any battery for 3s to 5s until the LEDs starts
flashing orange. Alternatively, the ON/OFF signal at the M12 connector can be connected to GND by
an external switch.
Step 2: Press the button on any battery for at least 5s until the LED on this battery turns red (300ms),
off (300ms), green (300ms) and off (600ms) until the configuration is done (LED green). See also
We
recommend
to
check/update
the
firmware
of
your
battery
here:
https://filecloud.varta-microbattery.com/?t=d3787575f81651bda7f959279b063658
Technical details:
Batteries which are not configured will not have a valid Node ID and will also not send any messages
on the CAN bus. When configuring the system by pushing the button for at least 5s, the batteries will
determine the master of the system dependent on the highest serial number of the batteries. The
Node IDs will be assigned in order of the serial numbers. When all Node IDs are assigned, the battery
Содержание 56650 764 098
Страница 1: ...1 ...
Страница 12: ...13 6 Description of the battery 6 1 Easy Blade ...