8.  Weld or bolt the mounting angle to the poles or I Beams you are clamped to and follow the 

same procedure at the bottom of the scoreboard, clamp and weld or bolt. Follow by welding or 
bolting the angle to the center pole or I Beam at the top and bottom. It may be necessary to 
use clamps here as well. 

 

9.  Install any options such as horns or sponsor panels. 

 
 
 

RUNNING/CONNECTING THE CONTROL CABLE 

(For scoreboards with Wireless Remote Control, skip this step.) 

 

 

The  control  cable  may  be  buried  with  or  without  conduit  if  the  cable  is  direct  burial-rated.  Direct 

burial-rated cable in conduit is recommended for extended trouble free use. If  the cable is not direct 
burial-rated  cable,  then  it  must  be  buried  in  a  sealed,  watertight  conduit.    The  same  is  true  for  the 
electric cable powering the scoreboard. Both cables may be buried in the same trench but they must 
be kept at least 6” apart. If conduit is required for both, separate conduits must be used. 

The  control  cable  should  run  from  the  scoreboard  to  a  location  that  is  within  10  feet  of  the 

scorekeeper’s location.  Here, the supplied junction box cover should be installed on a 2x4, single-
gang  junction  box.    The  keyboard  will  connect  to  the  receptacle  on  the  junction  box  cover  via  the 
included 20-ft. control cable. 

 

At the scorekeeper’s location: 

 

  Bring  the  control  cable  into  a  2x4  single-gang  junction  box  located  within  10  feet  of  the 

scorekeeper. 

  Connect the leads inside the control cable to those on the junction box cover according to the 

label  on  the  junction  box  cover.    Refer  to  the  installation  diagram  on  the  following  page  for 
more information. 

                                                    

 

 

NOTE: IF THE WIRES IN YOUR CABLE DO NOT COLOR MATCH WHAT IS SHOWN ABOVE, 
CONNECT TO THE TERMINALS WITH THE BLACK, GREEN, AND WHITE CONDUCTORS. 
DO NOT CONNECT A WIRE TO THE RED TERMINAL.  MATCH THE SAME COLORS IN 
YOUR CABLE TO THE BLACK, GREEN, AND WHITE WIRES ON THE BACK OF THE WALL 
PLATE AT THE SCORING LOCATION. 

 

  Secure the junction box cover to the installed junction box. 

 

At the scoreboard: 

 

  Remove  the  signal/power  access  door  located  on  the  back  of  panel  A.    For  access  door 

location, refer to the diagram on the following page. 

Содержание 3359

Страница 1: ...INSTALLATION INSTRUCTIONS FOR MODEL 3359 www varsityscoreboards com...

Страница 2: ...tion Cable controlled systems standard 1 20 ft control cable 1 Junction box cover with built in 5 pin din socket 1 Customer specified length of control cable Wireless systems optional 1 Wireless trans...

Страница 3: ...ded with each option package Test the installed system PRODUCT SPECIFICATIONS Overall Dimensions 8 0 tall x 20 0 long x 8 deep shipped in five 5 sections Weight Hanging weight approximately 1 800 lbs...

Страница 4: ...two of the 10 angle iron as the top mounting angle iron Ensure that the pin for your clevis will pass through those holes If not it is easier to make changes before going further whether a smaller cl...

Страница 5: ...o concrete footers When installing the poles I beams that support the scoreboard it is important to keep the spacing accurate and the faces straight The poles beams should be allowed to stand overnigh...

Страница 6: ...nstallation kit making one assembly 3 Install crossover nipples between the cabinets Failure to install crossover nipples will void the warranty 4 Connect ALL crossover cables between cabinets as in t...

Страница 7: ...e should run from the scoreboard to a location that is within 10 feet of the scorekeeper s location Here the supplied junction box cover should be installed on a 2x4 single gang junction box The keybo...

Страница 8: ...ried in conduit it must be run in sealed watertight conduit from the ground up to the signal cable power access door located on the back of the scoreboard Here it must pass through a rain tight condui...

Страница 9: ...None of the scoreboards components should be lit at this time If any components are lit especially with a solid 8 check the crossover connections between cabinets Ensure that the red stripes on the ri...

Страница 10: ..._ Date Installation Completed _________________________________ Company Or Person Responsible For Installation address phone number ________________________ This document confirms that the installatio...

Отзывы: