INSTALLATION OVERVIEW 

 

 

 

This manual will walk  you through the installation of the scoreboard.   While care has been taken to 
consider the many scenarios for installation, some general information applies to all.  Use this guide 
as closely as possible to ensure proper installation, as follows: 
 

 

  Review the product specifications below to determine your specific installation hardware. 

  Determine where to install the scoreboard and install the mounting poles/beams  

NOTE:

 

ALL  HARDWARE  REQUIRED  TO  MOUNT  THE  SCOREBOARD  TO  POLES  OR  I  BEAMS  IS 

SUPPLIED BY THE CUSTOMER

  Arrange scoreboard panels for the assembly process.  

  

 

   

  Install sponsor panels if applicable. 

  Install the control cable for cable-controlled systems.  No additional installation is necessary 

for Wireless Remote Control systems. 

  Install electrical system. 

  Install  any  other  options;  such  as  protective  nets  or  horns,  according  to  the  installation 

instructions included with each option package. 

  Test the installed system. 

 

   

PRODUCT SPECIFICATIONS 

 

Overall Dimensions: 

 

 

8’-0” tall x 20’-0” long x 8” deep; shipped in five (5) sections 

 

Weight: 

 

 

Hanging weight = approximately 1,800 lbs. - Shipping weight = approximately 1,860 lbs. 

 

Mounting Recommendations: 

 

(2

)  8”  steel  I-beams  (W8  x  31)  or  (2)  8”  OD  galvanized  steel  poles  (schedule  40).  Total  length 

determined by local codes, mounting height, and scoreboard options. 

 

Power Requirements: 

 

 

Scoreboard 

(1)  120-volt,  20-amp,  60  Hz  grounded  AC  circuit  connected  to  a  power  disconnect  switch  or 
circuit breaker (refer to the wiring diagram on page 8 for detailed instructions on determining 
the scoreboard’s power requirements – specific power requirement information is also marked 
on the scoreboard’s serial number label, located on the scoreboard) 
 

 

Keyboard Controller 

(1)  120-volt,  15-amp,  60  Hz  grounded  AC  circuit  in  a  standard  duplex  outlet  (optional  if  an 
internal battery pack was purchased with the controller or using a handheld controller) 

 

Cable Recommendations (for cable-controlled systems only): 

 

Four conductor cable 

– 28 gauge, twisted pair (two pairs), shielded data cable.

 

 
 

 

 

Содержание 3359

Страница 1: ...INSTALLATION INSTRUCTIONS FOR MODEL 3359 www varsityscoreboards com...

Страница 2: ...tion Cable controlled systems standard 1 20 ft control cable 1 Junction box cover with built in 5 pin din socket 1 Customer specified length of control cable Wireless systems optional 1 Wireless trans...

Страница 3: ...ded with each option package Test the installed system PRODUCT SPECIFICATIONS Overall Dimensions 8 0 tall x 20 0 long x 8 deep shipped in five 5 sections Weight Hanging weight approximately 1 800 lbs...

Страница 4: ...two of the 10 angle iron as the top mounting angle iron Ensure that the pin for your clevis will pass through those holes If not it is easier to make changes before going further whether a smaller cl...

Страница 5: ...o concrete footers When installing the poles I beams that support the scoreboard it is important to keep the spacing accurate and the faces straight The poles beams should be allowed to stand overnigh...

Страница 6: ...nstallation kit making one assembly 3 Install crossover nipples between the cabinets Failure to install crossover nipples will void the warranty 4 Connect ALL crossover cables between cabinets as in t...

Страница 7: ...e should run from the scoreboard to a location that is within 10 feet of the scorekeeper s location Here the supplied junction box cover should be installed on a 2x4 single gang junction box The keybo...

Страница 8: ...ried in conduit it must be run in sealed watertight conduit from the ground up to the signal cable power access door located on the back of the scoreboard Here it must pass through a rain tight condui...

Страница 9: ...None of the scoreboards components should be lit at this time If any components are lit especially with a solid 8 check the crossover connections between cabinets Ensure that the red stripes on the ri...

Страница 10: ..._ Date Installation Completed _________________________________ Company Or Person Responsible For Installation address phone number ________________________ This document confirms that the installatio...

Отзывы: