background image

11-03

EP E

 series

Illustrations may differ from the actual product 

Allowing for printing errors and errors on proofs

9

Electrical installation

Remote control/external block

A PCB input has different functions depending on the position of SW 

4/1. The functions cannot be used at the same time.
1.  Remote/telephone control, switching between normal and low 

temperature mode depending on the status of the input.

2. Block of entire boiler power. External stage/power control

Remote control

This function could be used to maintain a low temperature, for 

example for frost protection when the house is unoccupied. If a 

telephone remote control is connected, the temperature can be 

changed by making a phone call.  

The contact function in the control unit must be voltage-free. 

Open between 2 and 3 means the temperature setting is as 

described in 24.
Closed between 2 and 3 means that the normal temperature setting 

is used.

Switch 1 in position ON

5

25

24

1

2

34

External block - external stage/power control

The boiler can be blocked by an external voltage-free contact. If the 
boiler is blocked in a mode in which power is connected, the power 
will be reduced until all power stages are disconnected.
The boiler can be controlled by an external voltage signal, 0-10 V dc, 
or current signal, 0- 10 mA or 0- 20 mA dc.
The external control signal controls the power stages between 0- 
100% of installed power. See “Installed power”.
The temperature control within the boiler itself takes precedence, so 
the boiler temperature setting should be slightly higher than neces-
sary for the system.
The boiler Power/status light will flash "One long � two short fl ash-

 � two short fl ash-

� two short flash-

es" until the external control signal reaches 100%.

Switch 1 in position OFF

5

25

24

1

2

34

External block

Jumpers 2 - 3 removed. 
Voltage-free contact to 2 -3. 

Passive 0-10 V 

The external control equipment 

sends 0- 10 V dc to the boiler 

motherboard. 

Jumpers 2 -3. 

Connect the control signal to 

2- 3, polarity as shown. 

 

 

Active 0-10 V 

The external control equip-

ment receives 10 V dc from the 

boiler motherboard. 

Connect the control signal to 

3 - 4, polarity as shown.

0- 10 mA 

Jumpers 2 - 3 removed. 

Connect a 1,1 k

 resistor to 

3- 4. 

Connect the control signal to 3 

-4, polarity as shown. 

0- 20 mA 

Jumpers 2 - 3 removed. 

Connect a 523 

 resistor to 

3 - 4. 

Connect the control signal to 

3 - 4, polarity as shown.

External display of connected power

Terminals 1 

and

 4 of terminal block send a 0-10V signal, proportional 

to the connected power, 0-100% of the installed power. See “Instal-
led power”.

1 2 3 4

GND

0-10V

5

Installed power

The selected number of stages corresponds to the installed power.
In the example, the boiler is set so that it can only use five output 

stages, so five output stages is then the installed power. 

For voltage control, 0-10 Vdc, 10 V is required in order to connect the 

five stages.  

The same applies to the voltage signal indicating the connected 

power.

5

5

GND

Control signal

GND

Control signal

GND

Control signal

GND

Control signal

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

5

5

5

Содержание EP E Series

Страница 1: ...Installation operation and care EP E Series 7 stage electric boilers EP 26E and EP 42E 2011 03 21 utg xxxxxx Ers tter 08 05...

Страница 2: ...tures 4 Technical data 5 HVAC installation 6 Siting the boiler Cables and pipework Safety supply pipe Waterquality Frostprotection Flow requirement HVAC installation 7 Pressure drop diagram Direction...

Страница 3: ...s are shown in bold Numberofpower stages 7 6 5 4 1 2 ON ON OFF OFF ON OFF ON OFF Cirkulationpump 3 OFF ON eco summer mode continuous operation Main fuse EP42 EP26 1 3 125A 100A 80A 63A 50A 35A ON ON O...

Страница 4: ...onnected power according to the current heating requirement The power can be limited to four power stages For safety the boiler can handle zero flow in other words it does not need to be fitted with a...

Страница 5: ...thread 34 Drain valve R15 35 Opening cover for electrical connections 36 Cable bushing 37 Adjustable base bolts EP 26 E EP 42 E Power 26 25 42 kW Current 37 9 61 A Power stage 3 75 6 kW Current stage...

Страница 6: ...e the system watertight so that no new oxygen rich water has to be added and to ensure that the water is not oxygenated during installation In large systems it is virtually impossible to prevent leaks...

Страница 7: ...ted statistical pressure on the suction side Closed expansion system 2 5 bar 100 kW and 110 C The safety and venting valves are mounted on the boiler safety pipe 2 5 bar 100 kW and 110 C The safety va...

Страница 8: ...tallation Electrical installation must be in accordance with the applicable regulations under the supervision of an authorised installer The boiler and water heater must be filled with water before el...

Страница 9: ...wer The temperature control within the boiler itself takes precedence so the boiler temperature setting should be slightly higher than neces sary for the system The boiler Power status light will flas...

Страница 10: ...g 8 PCB 9 Indicator for power group one 10 Indicator for power group two 11 Indicator for power group three Wiring diagram EP 26 E 12 Alarm overheat protection triggered 13 Alarm relay 14 Control swit...

Страница 11: ...eat protection triggered 1 2 3 4 1 2 3 4 1 2 1 2 3 4 1 2 3 2 3 4 5 6 9 7 8 11 10 12 13 14 15 16 17 18 19 20 21 1 22 23 40 13 Alarm relay 14 Control switch 15 Control fuse 16 Overheat protection power...

Страница 12: ...f the power can be connected immediately after a loss of power lasting longer than three minutes The remaining power is delayed by an hour To test the boiler after it has been without power for exampl...

Страница 13: ...ondition Ask the installer to demonstrate the settings and functions so you know exactly how to operate and care for the system Check the water pressure air may remain in the system for a while after...

Страница 14: ...mited Check the setting see page 8 Number of power stages The boilers is being controlled by a 0 10 V signal The boiler temperature setting is too low Outdoor temperature compensa tion is connected th...

Страница 15: ...ock 3 pole 1 1 16 00 06 End plate 1 1 16 00 09 Jumper 2 pole 6mm 1 1 16 00 11 Jumper 4 pole 6mm 1 1 16 00 12 End support 2 2 16 00 13 Bar bracket 1 1 40 16 00 18 Neutral terminal NPF 35 1 6 6 40 16 00...

Страница 16: ...4644 226358 291 94 Kristianstad www varmebaronen se Sweden info varmebaronen se V rmebaronen AB retains the right to change the specification of included components without prior notice as part of it...

Отзывы: