Maintenance and repair
Operating instructions
Page 52 of 62
VarioShaker 270 with control box
It
e
m
n
u
mbe
r:
V
A
-A
rt
-00018
|
V
e
rs
io
n
:
0
5
/2
0
1
9
_
e
n
7.1 Preparation and general measures for maintenance and repair
Maintenance and repair work may only be performed by trained and instructed
experts. Pay attention to the current legal and operational provisions for
maintenance and repair work.
The VarioShaker 270 is maintenance-free. Should, however, any repair or
maintenance work be necessary, the device must be disconnected from all energy
sources.
Pull out the plug connection to the VarioShaker 270 for this.
Figure 7.1:
Preparation and general measures for maintenance and repair
Make sure that all tools, cleaning cloths and other materials are removed from the
work area after completion of the maintenance work.
Remove liquids in a proper and environment-friendly manner. Before
commissioning the machine, check the proper assembly and function of all safety
equipment.
Should there be any further questions about repair and maintenance work, please
contact the manufacturer under the contact options specified in the Service
chapter.
Содержание VA-Art-00018
Страница 2: ......