![Varian VHS-6 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/varian/vhs-6/vhs-6_instruction-manual_854709019.webp)
Operation
2-2
2-2
SHUTDOWN PROCEDURE
a
Turn off the power to the diffusion pump. Continue to back the diffusion pump with the appro-
priate mechanical pump.
b
Allow cooling water to flow through the diffusion pump until the pump body temperature,
located just above the boiler plate, has cooled to a temperature of approximately 130°F.
Содержание VHS-6
Страница 27: ...Replacement Parts 5 2 ...
Страница 28: ...Replacement Parts 5 3 ...